No label defined (Q3134418)

From EU Knowledge Graph
Revision as of 21:19, 7 October 2021 by DG Regio (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project 0.5067236323770546 in Spain
Language Label Description Also known as
English
No label defined
Project 0.5067236323770546 in Spain

    Statements

    0 references
    691,200.0 Euro
    0 references
    864,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2022
    0 references
    DIPUTACION DE BADAJOZ
    0 references
    06015
    0 references
    Con esta operación se plantea tres objetivos:_x000D_ • Por un lado se pretende la adquisición, rehabilitación y dotación de un inmueble con la finalidad de prestar el servicio de apoyo extenso o generalizado, siempre que precisen de la ayuda de otra persona para la realización de las actividades de la vida diaria y que no puedan ser atendidos en su medio familiar, prestando al mismo tiempo tratamientos especializados para desarrollar al máximo sus potencialidades y evitar en la mayor medida posible su deterioro o involución. Incluye parte de equipamiento._x000D_ • Además se ejecutará la adecuación eléctrica de la Casa del Navegante: La localidad de Montijo dispone de un edificio singular denominado “Casa del Navegante”. Se ubica en la Plaza de España y es uno de los edificios civiles de mayores proporciones de la localidad. Actualmente, este edificio alberga servicios administrativos dedicados a los Servicios Sociales de Base. Las instalaciones eléctricas y de climatización del edificio presentan un estado precario, faltas de seguridad y de unas condiciones inaceptables para su uso. Los cuadros y canalizaciones están colapsados, líneas grapeadas sin la debida protección, con canaletas saturadas (además del impacto visual que presenta en este edificio, circuitos sobrecargados que, debido a la escasez de tomas de corriente, utilizan regletas multitomas que aumentan el riesgo de sobrecarga. También se pretende implementar la iluminación para adecuarla al uso que comprende, así como la deficiente iluminación de emergencia._x000D_ • Por último: realización de cursos de capacitación relacionados con las inversiones precedentes:_x000D_ ATT SOCIOSANITARIA A DEPENDIENTES EN INSTITUCIONES SOCIALES (Spanish)
    0 references
    With this operation there are three objectives:_x000D_ • On the one hand it is intended the acquisition, rehabilitation and provision of a property in order to provide extensive or generalized support service, provided that they need the help of another person to carry out the activities of daily life and not They can be taken care of in their family environment, while providing specialized treatments to maximize their potential and avoid deterioration or involution as much as possible.Includes some equipment._x000D_ • In addition, the electrical adaptation of the Casa del Navegante will be executed: The town of Montijo has a unique building called “Casa del Navegante”. It is located in the Plaza de España and is one of the largest civil buildings in the town. Currently, this building houses administrative services dedicated to the Basic Social Services. The electrical and air conditioning installations of the building have a precarious state, lack of security and unacceptable conditions for its use. The panels and pipes are collapsed, lines splattered without due protection, with saturated gutters (in addition to the visual impact presented in this building, overloaded circuits that, due to the shortage of power outlets, use multi-jack strips that increase the risk of overloading It is also intended to implement the lighting to adapt it to the use it comprises, as well as the poor emergency lighting._x000D_ • Finally: training courses related to previous investments:_x000D_ CORPORATE ATTENDANCE TO DEPENDENTS IN SOCIAL INSTITUTIONS (English)
    0 references
    Badajoz
    0 references

    Identifiers

    FCL01EX0614
    0 references