Creation of Public Garden for leisure and recreation on str. Avram Iancu, Punchy City (Q2743154)

From EU Knowledge Graph
Revision as of 09:19, 7 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q2743154 in Romania
Language Label Description Also known as
English
Creation of Public Garden for leisure and recreation on str. Avram Iancu, Punchy City
Project Q2743154 in Romania

    Statements

    0 references
    525,443.61 Romanian Leu
    0 references
    105,088.72200000001 Euro
    13 September 2021
    0 references
    618,168.96 Romanian Leu
    0 references
    123,633.792 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    3 March 2017
    0 references
    31 August 2022
    0 references
    ORAŞUL PUCIOASA
    0 references
    0 references

    45°4'34.14"N, 25°26'3.37"E
    0 references
    Obiectivul general al proiectului este crearea/reabilitarea a 1.398 mp de spații deschise, în Orașul Pucioasa, în perioada de implementare a proiectului, dar nu mai târziu de 31.12.2023. Atingerea obiectivului specific asigură atingerea obiectivului general al proiectului. Obiectivul general al proiectului se va considera îndeplinit dacă s-a admis recepția la terminarea lucrărilor, pentru spațiile deschise create/reabilitate, conform Procesului verbal de recepție la terminarea lucrărilor, iar în cartea tehnică a construcției sunt documente care atestă faptul că au fost create/reabilitate 1.398 mp de spații deschise, în perioada de implementare a proiectului, dar nu mai târziu de 31.12.2023. (Romanian)
    0 references
    The general objective of the project is the creation/rehabilitation of 1,398 sqm of open spaces, in Pucioasa Town, during the project implementation period, but no later than 31.12.2023. The achievement of the specific objective ensures the achievement of the general objective of the project. The general objective of the project will be considered to be achieved if the reception at the end of the works has been accepted, for open spaces created/rehabilitation, according to the acceptance report at the end of the works, and in the technical book of the construction there are documents proving that 1.398 sqm of open spaces were created/rehabilitated during the project implementation period, but no later than 31.12.2023. (English)
    14 September 2021
    0 references
    Oraş Pucioasa, Romania
    0 references

    Identifiers

    114382
    0 references