Project phase Integrated waste management system in Caras-Severin county (Q3095711)
Jump to navigation
Jump to search
Project Q3095711 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Project phase Integrated waste management system in Caras-Severin county |
Project Q3095711 in Romania |
Statements
19,999,317.77 Romanian Leu
0 references
23,528,609.13 Romanian Leu
0 references
85.0 percent
0 references
1 August 2016
0 references
30 September 2021
0 references
JUDEŢUL CARAŞ-SEVERIN
0 references
Obiectivele proiectului au fost stabilite pe baza obiectivelor POIM 2014-2020 si ale Strategiei 2020 (Obiectiv tematic 06 - Conservarea și protecția mediului și promovarea utilizării eficiente a resurselor), respectiv: - reducerea cantităţii de deşeuri depozitate; - promovarea utilizării deşeurilor pentru producţia de materii prime alternative, prin creşterea cantităţii de deşeuri reciclate/valorificate; - crearea unor condiţii de viaţă decente prin stabilirea unor structuri eficiente de management al deşeurilor si asigurarea unui mediu de viaţă curat. Proiectul propus spre finanțare din POIM 2014-2020 reprezintă Faza 2 a proiectului “Sistem Integrat de Management al Deşeurilor în judeţul Caraş-Severin”, care îşi propune continuarea investiţiilor în sectorul de gestionare a deşeurilor solide, începute în Faza 1, prin POS Mediu 2007-2013, prin completarea/extinderea infrastructurii existente de gestionare a deşeurilor, prin realizarea unor investiţii care să conducă la dezvoltarea unui sistem de management integrat al deşeurilor, astfel încât să fie atinse standardele de conformitate cu cerinţele UE referitoare la protecţia mediului, precum şi ţintele asumate de România prin Tratatul de Aderare la Uniunea Europeană, respectiv: - reducerea cantității anuale de deșeuri biodegradabile depozitate cu 65% față de cantitatea totală depozitată în anul 1995; - reducerea considerabilă a depozitarii deșeurilor de ambalaje (88% recuperare, 70% reciclare); - închiderea depozitelor de deșeuri neconforme. (Romanian)
0 references
The objectives of the project were established on the basis of the LIOP 2014-2020 objectives and the 2020 Strategy (Thematic Objective 06 – Preserving and protecting the environment and promoting resource efficiency), namely: — reducing the amount of waste landfilled; — promoting the use of waste for the production of alternative raw materials by increasing the amount of recycled/recovered waste; — creating decent living conditions by establishing efficient waste management structures and ensuring a clean living environment. The project proposed for funding from LIOP 2014-2020 represents Phase 2 of the project “Integrated Waste Management System in Caras-Severin County”, which aims to continue investments in the solid waste management sector, started in Phase 1, through SOP Environment 2007-2013, by supplementing/extension of the existing waste management infrastructure, by making investments leading to the development of an integrated waste management system, so that the standards of compliance with the EU environmental protection requirements are met, as well as the targets assumed by Romania through the Treaty of Accession to the European Union, namely: — reducing the annual amount of biodegradable waste landfilled by 65 % compared to the total quantity landfilled in 1995; a considerable reduction in the storage of packaging waste (88 % recovery, 70 % recycling); — closure of non-compliant landfills. (English)
16 September 2021
0 references
Bozovici, Romania
0 references
Pojejena, Romania
0 references
Oraş Oţelu Roşu, Romania
0 references
Oraş Oraviţa, Romania
0 references
Oraş Moldova Nouă, Romania
0 references
Oraş Băile Herculane, Romania
0 references
Oraş Bocşa, Romania
0 references
Oraş Anina, Romania
0 references
Municipiul Reşiţa, Romania
0 references
Municipiul Caransebeş, Romania
0 references
Lupac, Romania
0 references
Identifiers
106647
0 references