Rehabilitation, extension, modernisation, equipping of educational structure – Garden of children with extended program no.3, Șimleu Silvaniei (Q2746209)

From EU Knowledge Graph
Revision as of 20:15, 6 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2746209 in Romania
Language Label Description Also known as
English
Rehabilitation, extension, modernisation, equipping of educational structure – Garden of children with extended program no.3, Șimleu Silvaniei
Project Q2746209 in Romania

    Statements

    0 references
    4,933,587.62 Romanian Leu
    0 references
    986,717.5240000001 Euro
    13 September 2021
    0 references
    5,804,220.7 Romanian Leu
    0 references
    1,160,844.1400000001 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    18 November 2015
    0 references
    31 December 2021
    0 references
    ORASUL SIMLEU SILVANIEI
    0 references
    0 references
    Obiectivul proiectului este reprezentat de reabilitarea, extinderea, modernizarea, echiparea structurii educationale Gradinita de copii cu program prelungit nr .3 Simleu Silvaniei Suprafata vizata cuprinde 2 corpuri diferite: 1. Corpul principal ( 54110-C1)- este reprezentat de clădirea grădiniței cu o suprafață construită inregistrată de 946 mp, si o suprafață desfașurată de 1892 mp.Cladirea principala este alcatuita si ea la randul ei din 3 corpuri principale asemănătoare, având câte două săli de grupă la parter si alte 6 sali de grupa la etaj și spații anexe :holuri, vestiare, spații de depozitare, grupuri sanitare pentru copii, care sunt conectate între ele prin intermediului unui corp central de legătura, corp ce cuprinde funcțiuni ce deservesc programul principal :alimentația copiilor, spălătoria/călcătorie cu spațiile anexe, vestiare și grupuri sanitare pentru personalul grădiniței. Numarul total al salilor de grupa este de 8 sali, pe langa acestea exista si o sala de gimnastica si o sala a centrului CRED. 2. Magazia (54110- C2)- cu funcțiune de depozitare. Se doreste reabilitarea si modernizarea corpului principal C1, demolarea corpului C2 si construirea anexei noi (extindere cladire principala). Noul imobil construit in locul C2 va fi legat de clădirea principală, si va fi folosit ca zonă de acces in gradinita și vestiare pentru personalul care lucrează la bucătărie. In directia acestui obiectiv Orasul Simleu Silvaniei a recurs la urmatoarele actiuni: -in anul 2014 prin HCL 60/28.08.2014 s-a aprobat Strategia Locala de Dezvoltare Durabila a orasului Simleu Silvaniei pentru perioada 2014-2020 si Planul local de de Actiune pentru Dezvoltarea Durabila a orasului Simpleul Silvaniei pentru perioada 2014-2020. La Capitolul Directii Strategii de actiune ,in cadrul Directia strategica 2 „Dezvoltarea infrastructurii locale”, Obiectiv operational 2.1 – Asigurarea accesului la infrastructura si servicii de educatie de calitate pentru toti locuitorii, Sub-obiectivul 2.1.1 Crearea/reabilitarea/modernizarea/extinderea infrastructurii educationale si cresterea actului Educational, se mentioneaza ca si proiecte “Reabilitarea/modernizarea/extinderea unitatilor de invatamant In acest context reabilitarea si dotarea cladirii Gradinitei de copii nr. 3 se incadreaza in cadrul planului de actiune propus, contribuind la cresterea calitatii actului educational. Proiectul de asemenea este in concordonta cu Obiectivul specific al axei 10.1- Creșterea gradului de participare la nivelul educaţiei timpurii şi învăţământului obligatoriu, în special pentru copii cu risc crescut de părăsire timpurie a sistemului. Astfel se va asigura creșterea accesului, calității și a atractivității educației, contribuind la creșterea ratei de participare la diferite niveluri de educație, la reducerea abandonului școlar și a părăsirii timpurii a școlii, la o rată mai mare de absolvire a învățământului obligatoriu și la creșterea ratei de tranziție spre nivel (Romanian)
    0 references
    The objective of the project is to rehabilitate, expand, modernise, equip the educational structure Gradinita by children with extended hours no.3 Simleu Silvaniei The target area comprises 2 different bodies: 1. The main body (54110-C1)- is the kindergarten building with a registered built area of 946 sqm, and an area of 1892 sqm. The main building is also made up of 3 similar main bodies, having two group rooms on the ground floor and 6 group rooms on the first floor and 6 rooms: changing rooms, warehousing, bathrooms for children, which are connected to each other by means of a central connecting body, body that includes functions serving the program principal:alimentația children, laundry/journey with adjacent spaces, lockers and toilets for kindergarten staff. The total number of group halls is 8 rooms, besides these there is a gym and a hall of the CRED center. 2. Storeroom (54110-C2)- with storage operation. We want the rehabilitation and modernisation of the main body C1, the demolition of the C2 body and the construction of the new annex (main building extension). The new building built in place C2 will be linked to the main building, and will be used as an access area in the kindergarten and changing rooms for the staff working at the kitchen. In the direction of this objective Simleu Silvaniei city resorted to the following actions: in 2014 the Local Sustainable Development Strategy of Simleu Silvaniei for 2014-2020 and the Local Action Plan for the Sustainable Development of Simpleul Silvaniei for 2014-2020 were approved by HCL 60/28.08.2014. At the Chapter of the Action Strategies Directorate, within the Strategic Directorate 2 "Development of local infrastructure", Operational Objective 2.1 – Ensuring access to the infrastructure and quality education services for all inhabitants, Sub-objective 2.1.1 Creation/rehabilitation/modernisation/extension of the educational infrastructure and the increase of the Educational Act, it is mentioned as projects "Rehabilitation/modernisation/extension of educational units In this context the rehabilitation and endowment of the children’s kindergarten no. 3 is part of the proposed action plan, contributing to increasing the quality of the educational act. The project is also in line with the specific objective of Axis 10.1 – Increasing participation in early childhood and compulsory education, especially for children at high risk of early leaving. This will ensure increased access, quality and attractiveness of education, helping to increase participation in different levels of education, reducing early school leaving and early school leaving, increasing compulsory education attainment and increasing the transition rate to the level of education (English)
    14 September 2021
    0 references
    Oraş Şimleu Silvaniei, Romania
    0 references

    Identifiers

    120878
    0 references