INTERVENTION WORKS IN ORDER TO INCREASE ENERGY PERFORMANCE AT THE “BISHOP NICOLAE POPOVICI” MUNICIPAL HOSPITAL THE BUILDINGS WITH NO. FALL. 103486-C1 AND NO. 103486-C14 (Q2745463)
Jump to navigation
Jump to search
Project Q2745463 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | INTERVENTION WORKS IN ORDER TO INCREASE ENERGY PERFORMANCE AT THE “BISHOP NICOLAE POPOVICI” MUNICIPAL HOSPITAL THE BUILDINGS WITH NO. FALL. 103486-C1 AND NO. 103486-C14 |
Project Q2745463 in Romania |
Statements
10,649,243.46 Romanian Leu
0 references
2,129,848.6920000003 Euro
0.2 Euro
13 September 2021
0 references
12,528,521.71 Romanian Leu
0 references
85.0 percent
0 references
11 September 2017
0 references
31 August 2021
0 references
MUNICIPIUL BEIUS
0 references
Obiectivul general al proiectului este: Cresterea eficientei energetice a Spitalului Municipal Episcop Nicolae Popovici din Beius, Stationar I compus din "cladirea veche" si "corp adaugat" asa cum sunt prezentate in Raportul de Audit Energetic. Prin prezentul proiect de crestere a eficientei energetice se propune implementarea unor masuri de eficientizare energetica si folosirea energiilor regenerabile ( pentru producerea energiei electrice necesare pentru iluminat, climatizare si apa calda menajera ) ceea ce va duce la o folosire optimizata a resurselor energetice locale pentru incalzire, apa calda menajera, ventilatie si iluminare cu efecte durabile de protejare a meiului inconjurator. Concret se propun pentru cele doua corpuri de cladire mentionate si in Auditul energetic ca si "corp adaugat" si "cladirea veche": - solutii de izolare a anvelopei -solutii de eficientizare a sistemelor de distributie pentru incalzire si apa calda menajera -solutii de minimizare a consumurilor de energie electrica - reabilitare instalatii sanitare si termice -solutii de iluminat eficiente energetic -solutii de minimizare a consumurilor de apa (Romanian)
0 references
The overall objective of the project is to: Increasing the energy efficiency of the Bishop Nicolae Popovici Municipal Hospital in Beius, Stationar I composed of the “old building” and “body added” as presented in the Energy Audit Report. The present project to increase energy efficiency proposes the implementation of energy efficiency measures and the use of renewable energies (to produce the electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding millet. Concretely it is proposed for the two building bodies mentioned in the Energy Audit as “body added” and “old building”: — tyre insulation solutions -efficient solutions of distribution systems for heating and domestic hot water – solutions for minimising electric energy consumption – rehabilitation of sanitary and thermal installations -Energy efficient lighting solutions – water consumption minimisation solutions (English)
14 September 2021
0 references
Municipiul Beiuş, Romania
0 references
Identifiers
118548
0 references