Construction of Lugoj highway – Deva lot 2, lot 3 and lot 4 (Dumbrava – Deva sector) – FAZA 2 (Q3095616)

From EU Knowledge Graph
Revision as of 13:13, 6 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3095616 in Romania
Language Label Description Also known as
English
Construction of Lugoj highway – Deva lot 2, lot 3 and lot 4 (Dumbrava – Deva sector) – FAZA 2
Project Q3095616 in Romania

    Statements

    0 references
    0 references
    0 references
    1,540,691,235.0 Romanian Leu
    0 references
    308,138,247.0 Euro
    13 September 2021
    0 references
    1,812,577,924.0 Romanian Leu
    0 references
    362,515,584.8 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    1 March 2021
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references

    44°27'33.66"N, 26°8'3.59"E
    0 references

    46°26'8.38"N, 23°46'21.25"E
    0 references
    The main socio-economic objectives of the projects are: - To improve the traffic efficiency through reduction of the travel time; - To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); - To improve traffic safety; - To reduce environmental impact; - To improve accessibility. After both phases are going to be finalized, the project as an overrole will accomplish the general objectives of the program - Priority Axis 1 - Improving mobility by developing the TEN-T network and subway. (Romanian)
    0 references
    The main socio-economic objectives of the projects are: — To improve the traffic efficiency through reduction of the travel time; — To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); — To improve traffic safety; — To reduce environmental impact; — To improve accessibility. After both phases are going to be Finalised, the project as an overrole will accomplish the general objectives of the program – Priority Axis 1 – Improving mobility by developing the TEN-T network and subway. (English)
    14 September 2021
    0 references
    Dumbrava, Romania
    0 references
    Municipiul Deva, Romania
    0 references

    Identifiers

    110562
    0 references