Elaboration of Feasibility Study and Technical Project for “High Speed Road Bacau – Pascani” (Q3095614)

From EU Knowledge Graph
Revision as of 13:13, 6 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3095614 in Romania
Language Label Description Also known as
English
Elaboration of Feasibility Study and Technical Project for “High Speed Road Bacau – Pascani”
Project Q3095614 in Romania

    Statements

    0 references
    0 references
    0 references
    0 references
    15,414,285.61 Romanian Leu
    0 references
    3,082,857.122 Euro
    13 September 2021
    0 references
    18,134,453.66 Romanian Leu
    0 references
    3,626,890.7320000003 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    31 December 2021
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references

    46°35'17.27"N, 26°57'44.96"E
    0 references

    44°25'14.34"N, 26°1'33.82"E
    0 references

    44°26'28.68"N, 26°5'50.28"E
    0 references
    Obiectivul general al proiectului, ca parte din TEN-T, este imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a creea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Realizarea prezentului proiect - faza Studiu de Fezabilitate si Proiect Tehnic al tronsonului de drum de mare viteza cuprins intre Bacau - Pascani contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la Organismul Independent pentru Evaluare. (Romanian)
    0 references
    The general objective of the project, as part of TEN-T, is to improve Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The realisation of this project – Phase Feasibility Study and Technical Project of the high-speed road section between Bacau – Pascani contributes to the result indicator 2S81 – Application for funding submitted for analysis and approval to the Independent Body for Evaluation. (English)
    14 September 2021
    0 references
    Municipiul Paşcani, Romania
    0 references
    Municipiul Roman, Romania
    0 references
    Municipiul Bacău, Romania
    0 references

    Identifiers

    118697
    0 references