Elaboration of Feasibility Study and Technical Execution Project for Expres Gaesti – Ploiesti (Q3099043)

From EU Knowledge Graph
Revision as of 14:15, 5 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3099043 in Romania
Language Label Description Also known as
English
Elaboration of Feasibility Study and Technical Execution Project for Expres Gaesti – Ploiesti
Project Q3099043 in Romania

    Statements

    0 references
    14,162,482.75 Romanian Leu
    0 references
    2,832,496.5500000003 Euro
    13 September 2021
    0 references
    16,661,744.41 Romanian Leu
    0 references
    3,332,348.882 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 October 2020
    0 references
    1 December 2022
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    Obiectivul general al proiectului este de a spori eficiența economică a rețelei de transport din România si de a aduce îmbunătățiri în ceea ce privește viteza de călătorie între Găești și Ploiești, îmbunătățind astfel și conectivitatea la nivel regional. Proiectul asigură de asemenea, un traseu de bună calitate pentru vehiculele de transport mărfuri între centrul industrial Craiova, Pitești și Ploiești și Galați – Brăila. Analiza fluxurilor de trafic din Modelul Național de Transport arată că standardul potrivit pentru acest proiect este cel de drum expres. Realizarea prezentului proiect - faza elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru Drum Expres Gaesti – Ploiesti contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la Comisia Europeana / Organismul Independent pentru Evaluare. (Romanian)
    0 references
    The overall objective of the project is to increase the economic efficiency of the Romanian transport network and to improve the speed of travel between Găești and Ploiesti, thus also improving connectivity at regional level. The project also provides a good quality route for freight transport vehicles between Craiova, Pitesti and Ploiești and Galati – Brăila industrial center. The analysis of traffic flows in the National Transport Model shows that the right standard for this project is the express road. Implementation of this project – Phase of Feasibility Study and Technical Execution Project for Drum Expres Gaesti – Ploiesti contributes to the result indicator 2S81 – Application for funding submitted for analysis and approval to the European Commission/Independent Body for Evaluation. (English)
    16 September 2021
    0 references
    Oraş Găeşti, Romania
    0 references
    Municipiul Ploieşti, Romania
    0 references

    Identifiers

    126809
    0 references