Svätý Peter, the whole municipal sewage system and WWTP (Q3107959)

From EU Knowledge Graph
Revision as of 14:42, 28 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The purpose of the project is to implement the whole municipal waste water treatment plant and sewage network -gravitation type in the village of Svätý Peter in order to achieve the limits of residual waste water pollution discharged to the recipient of the Hurbanovský canal in accordance with Slovak Government Regulation 296/2005 Coll., which lays down requirements for achieving good water status. This is an extensive line building.The sewerage...)
Jump to navigation Jump to search
Project Q3107959 in Slovakia
Language Label Description Also known as
English
Svätý Peter, the whole municipal sewage system and WWTP
Project Q3107959 in Slovakia

    Statements

    0 references
    8,008,453.91 Euro
    0 references
    9,421,710.48 Euro
    0 references
    85.0 percent
    0 references
    10 January 2016
    0 references
    8 January 2018
    0 references
    Obec Svätý Peter
    0 references
    0 references
    0 references

    47°52'23.52"N, 18°10'58.76"E
    0 references
    Účelom projektu je realizácia celo obecnej čistiarne odpadových vôd a stokovej siete -gravitačného typu v obci Svätý Peter s cieľom dosiahnutia limitov zbytkového znečistenia odpadových vôd, vypúšťaných do recipientu Hurbanovský kanál v súlade s Nariadením vlády SR 296/2005 Z.z., ktorým sa ustanovujú požiadavky na dosiahnutie dobrého stavu vôd. Jedná sa o rozsiahlu líniovú stavbu.Na kanalizáciu bude napojených 2652 obyvateľov obce, čo je 97,93% z celkového počtu obyvateľov. Vybuduje sa 27 711,90m kanalizačnej siete. Splašková voda bude odvádzaná do novovybudovanej obecnej ČOV, situovanej pri Hurbanovskom kanáli, ktorá bude v súlade so smernicou Rady 91/271/EHS a nariadením vlády SR č.296/2005 Z. z., kt. sa ustanovujú požiadavky na kvalitu a ciele povrchových vôd a limitné hodnoty ukazovateľov znečistenia odpad. vôd a osobitných vôd.Realizáciou aktivít projektu (vybudovanie splaškovej kanalizácie a ČOV budú dosiahnuté nasledovné výsledky:- Kompletné odkanalizovanie aglomerácie Svätý Peter o veľkosti 2737 EO o dĺžke 27 711,90 m- koncom roka 2017 sa vytvoria podmienky pre napojenie cca.  2652 obyvateľov (1053 ks gravitačných a tlakových kanalizačných odbočiek)-zvýšenie percentuálnej napojenosti producentov na verejnú splaškovú kanalizáciu v z pôvodných  0 % na 97,93%- vybudovanie vlastnej obecnej čistiarne odpadových vôd s kapacitou odvádzania celej aglomerácie-vytvoria sa kvalitatívne lepšie životné podmienky pre obyvateľstvo, čo prispeje k podpore vyváženého regionálneho rozvoja prostredníctvom zvyšovania konkurencie schopnosti regiónu- zníženie znečisťovania podzemných vôd netesnými žumpami- zníženie znečistenia povrchových vôd Hurbanovského kanála a rieky Nitra  nekontrolovaným vývozom fekálií zo žúmp- zvýšenie celkovej životnej úrovne obyvateľstva, ktorí žijú v nevyhovujúcich podmienkach (Slovak)
    0 references
    The purpose of the project is to implement the whole municipal waste water treatment plant and sewage network -gravitation type in the village of Svätý Peter in order to achieve the limits of residual waste water pollution discharged to the recipient of the Hurbanovský canal in accordance with Slovak Government Regulation 296/2005 Coll., which lays down requirements for achieving good water status. This is an extensive line building.The sewerage will be connected to 2652 inhabitants of the village, which is 97.93 % of the total population. 27711,90 m sewerage network will be built. Sewage will be sent to the newly built municipal WWTP, situated at the Hurbanov Canal, which will comply with Council Directive 91/271/EEC and Slovak Government Regulation No 296/2005 Coll., which lays down requirements for the quality and objectives of surface water and limit values for indicators of pollution of waste water and special waters.The implementation of the project activities (the construction of sewage sewerage and WWTP will achieve the following results:- Complete sewerage of the agglomeration of Svätý Peter about the size of 2737 EO with a length of 27711,90 m – conditions for connection of approx. will be created at the end of 2017.  2652 inhabitants (1053 pcs of gravity and pressure sewerage branches)-increasing the percentage connection of producers to public sewage sewage in the original 0 % to 97.93 %- the construction of its own municipal wastewater treatment plant with the capacity of draining the entire agglomeration-creating qualitatively better living conditions for the population, which will contribute to the promotion of balanced regional development through increasing the competitiveness of the region – reduction of groundwater pollution by leaking cesspools – reduction of surface water pollution of the Hurbanovský canal and river Nitra uncontrolled exports of faeces from cesspools- increasing the overall living standards of the population living in unsatisfactory conditions (English)
    28 September 2021
    0 references

    Identifiers

    310011A067
    0 references