CdR Youth Village – ul. Sunny, Hurbanovo (Q3107140)

From EU Knowledge Graph
Revision as of 14:36, 28 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is the partial deinstitutionalisation of the Centre for Children and Families Dedina Mládeže (CDR) aimed at creating conditions for the provision of a replacement environment at community level resulting from the Conception of ensuring enforcement of judicial decisions in institutions of social legal protection of children and social guardianship of children for the years 2016-2020, the Plan for the transformation and dein...)
Jump to navigation Jump to search
Project Q3107140 in Slovakia
Language Label Description Also known as
English
CdR Youth Village – ul. Sunny, Hurbanovo
Project Q3107140 in Slovakia

    Statements

    0 references
    824,912.02 Euro
    0 references
    970,484.73 Euro
    0 references
    85.0 percent
    0 references
    2 January 2020
    0 references
    3 January 2023
    0 references
    Ústredie práce, sociálnych vecí a rodiny
    0 references
    0 references

    48°8'54.96"N, 17°6'27.90"E
    0 references
    Cieľom projektu je čiastočná deinštitucionlizácia Centra pre deti a rodiny Dedina Mládeže (CDR) zameraná na vytvorenie podmienok pre zabezpečovanie náhradného prostredia na komunitnej úrovni vyplývajúca z Koncepcie zabezpečovania výkonu súdnych rozhodnutí v zariadeniach sociálnoprávnej ochrany detí a sociálnej kurately detí na roky 2016 – 2020, Plánu transformácie a deinštitucionalizácie náhradnej starostlivosti (máj 2017) schválenej uznesením z rokovania porady vedenia ministerstva PSVR SR a jej následných aktualizovaných verzií.Realizáciou projektu dôjde k presťahovaniu 1 špecializovanej samostatnej skupiny v počte 8 klientov do  novovybudovaného samostatne stojaceho rodinného domu (RD). Kapacita kmeňovej budovy sa zníži o 8 klientov. Zabezpečí sa náhradné prostredie na komunitnej úrovni, vytvoria sa podmienky na integráciu do spoločnosti, individuálny prístup k deťom a MD. Starostlivosť o deti v RD sa bude viac približovať chodu v bežnej rodine, zvýši sa úroveň prípravy na postupné osamostatnenie detí a úplné osamostatnenie MD. Nové priestory vytvoria lepšie podmienky pre prácu s deťmi umiestnenými do CDR na základe súdneho rozhodnutia, s profesionálnymi rodinami a pre prácu s biologickou a náhradnou rodinou.V rámci projektu budú realizované hl. aktivita Výstavba rodinného domu vrátane Stavebného dozoru, podporné aktivity Interný manažment, Publicita a informovanosť a VO. Navrhovaný RD bude samostatne stojaci, s vlastným súpisným číslom, samostatným vchodom a oplotením v zastavanom území obce, čo je podmienkou úspešnej integrácie detí do miestnych komunít.Merateľnými ukazovateľmi projektu budú kapacita podporených zariadení výkonu opatrení sociálnoprávnej ochrany detí a sociálnej kurately v počte 8 pobytových miest v novopostavenom RD, počet podporených zariadení výkonu opatrení sociálnoprávnej ochrany detí a sociálnej kurately v počte 1, počet nových verejných budov v počte 1 a podlahová plocha nových verejných budov v celkovej výmere 486,52 m2. (Slovak)
    0 references
    The aim of the project is the partial deinstitutionalisation of the Centre for Children and Families Dedina Mládeže (CDR) aimed at creating conditions for the provision of a replacement environment at community level resulting from the Conception of ensuring enforcement of judicial decisions in institutions of social legal protection of children and social guardianship of children for the years 2016-2020, the Plan for the transformation and deinstitutionalisation of replacement care (May 2017) approved by a resolution of the management of the Ministry of the PSVR SR and its subsequent updated versions.The project will be relocated 1 specialised separate group in the number of 8 clients to a newly built single-standing family house (RD). The capacity of the trunk building will be reduced by 8 clients. A community-based alternative environment will be provided, conditions for integration into society, individual approach to children and MD will be created. The care of children in the FWC will be closer to running in the ordinary family, the level of preparation for the gradual separation of children and the full autonomy of the MD will be increased. The new premises will create better conditions for working with children placed in the CDR on the basis of a court decision, with professional families and for working with biological and replacement family.The project will be carried out hl. activity Construction of a family house including Building supervision, support activities Internal management, Publicity and information and publicity and publicity. The proposed FWC will be detached, with its own inventory number, separate entrance and fencing in the built-up area of the village, which is a condition for the successful integration of children into local communities.Measurable indicators of the project will be the capacity of the supported facilities for the implementation of measures of social legal protection of children and social guardianship in the number of 8 residential places in the newly built RD, the number of supported facilities for the implementation of measures of social legal protection of children and social guardianship in the number of 1, the number of new public buildings in the number of 1 and the floor area of new public buildings in a total area of 486,52 m². (English)
    28 September 2021
    0 references

    Identifiers

    302021AKN6
    0 references