Reconstruction of the central boiler room for municipal buildings in Sihelné for biomass (Q3103812)
Jump to navigation
Jump to search
Project Q3103812 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the central boiler room for municipal buildings in Sihelné for biomass |
Project Q3103812 in Slovakia |
Statements
429,773.97 Euro
0 references
505,616.44 Euro
0 references
85.0 percent
0 references
1 September 2019
0 references
1 October 2020
0 references
Obec Sihelné
0 references
Obec Sihelné sa nachádza okrese Námestovo v Žilinskom kraji. V súčasnosti žije v obci 2 154 obyvateľov. Projekt rieši zmenu palivovej základne zdroja tepla v objekte základnej školy v obci Sihelné z tuhých palív na drevné pelety. Rekonštrukcia kotolne pre spaľovanie drevných peliet spadá do rámca opatrení zaoberajúcich sa ochranou a tvorbou životného prostredia v danom regióne. Súčasný spôsob vykurovania je z hľadiska súčasných nárokov na tepelnú pohodu prostredia, regulačné možnosti a ekonomický a hospodárnu prevádzku nevyhovujúci.V rámci zmeny palivovej základne dôjde demontážou existujúcej technológie kotolne a inštalácii novej technológie kotolne na spaľovanie drevných peliet. Hlavná aktivita projektu je „Výstavba zariadení využívajúcich biomasu prostredníctvom rekonštrukcie a modernizácie existujúcich energetických zariadení s maximálnym tepelným príkonom 20 MW na báze fosílnych palív“. Úspešná realizácia projektu so sebou okrem zlepšenia materiálno-technického stavu budovy prinesie tiež i zlepšenie energetickej efektívnosti a zvýšenie energetickej hospodárnosti budovy. (Slovak)
0 references
The village Sihelné is located in the district Námestovo in Žilina region. There are currently 2 154 inhabitants living in the village. The project addresses the change of the fuel base of the heat source in the building of the primary school in Sihelné from solid fuels to wood pellets. The reconstruction of the boiler room for burning wood pellets falls within the scope of measures dealing with the protection and creation of the environment in the region. The current heating method is unsatisfactory from the point of view of current requirements for the thermal well-being of the environment, regulatory possibilities and economical and economical operation. As part of the change of fuel base, the dismantling of the existing boiler room technology and the installation of new technology of the boiler room for burning wood pellets will occur. The main activity of the project is “Construction of biomass-based installations through the reconstruction and modernisation of existing energy installations with a maximum thermal input of 20 MW based on fossil fuels”. In addition to improving the material and technical condition of the building, the successful implementation of the project will also bring about an improvement in energy efficiency and an increase in the energy performance of the building. (English)
28 September 2021
0 references
Identifiers
310041U182
0 references