Maternity round – Ďurkov, reconstruction and expansion of capacity (Q3100636)

From EU Knowledge Graph
Revision as of 13:53, 28 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Summary OF BUSINESS POPIS PROJECTS In the village of Ďurkov there is a kindergarten, which is situated near the municipal office. The building of the kindergarten requires reconstruction due to insufficient capacity and poor technical condition. At present, we cannot accommodate all those interested in placing their children in kindergarten for capacity reasons. This poor situation with limited capacity and lack of facilities also means that chi...)
Jump to navigation Jump to search
Project Q3100636 in Slovakia
Language Label Description Also known as
English
Maternity round – Ďurkov, reconstruction and expansion of capacity
Project Q3100636 in Slovakia

    Statements

    0 references
    191,217.73 Euro
    0 references
    224,962.04 Euro
    0 references
    85.0 percent
    0 references
    1 February 2017
    0 references
    1 May 2020
    0 references
    Obec Ďurkov
    0 references
    0 references

    48°42'28.48"N, 21°26'47.18"E
    0 references
    ZHRNUTIE ZÁKLADNÝCH FAKTOV O PROJEKTE  STRUČNÝ POPIS PROJEKTU  V obci Ďurkov sa nachádza materská škola, ktorá je situovaná v blízkosti obecného úradu. Budova materskej školy si vyžaduje rekonštrukciu a to z dôvodu nedostatočnej kapacity a nevyhovujúceho technického stavu. V súčasnosti nedokážeme vyhovieť všetkým záujemcov o umiestnenie ich detí do materskej školy z kapacitných dôvodov. Aj tento nevyhovujúci stav s obmedzenou kapacitou a nedostatočnou vybavenosťou spôsobuje, že sa deti z marginalizovaných rómskych komunít (podobne ako iné deti mladšie ako 5 rokov) často do materskej školy nedostanú, prípadne majú nepravidelnú dochádzku. Pre deti z MRK je obzvlášť dôležitá predškolská výchova a starostlivosť. Väčšina týchto detí vyrastá v prostredí, ktoré ich znevýhodňuje v osobnostnom napredovaní a životných podmienkach. Mnohé z nich nemajú osvojené hygienické návyky, prvky slušného správania sa a tak majú problém so začlenením sa do spoločenského života. Dôsledkom toho je aj narastajúce napätie medzi rómskou populáciou a majoritnou spoločnosťou, nakoľko sú z ich pohľadu problémoví a neprispôsobiví. Realizáciou projektu dosiahneme rozšírenie kapacity materskej školy v našej obci a naplníme tak hlavný cieľ projektu, t. j. zabezpečiť deťom v predškolskom veku kvalitný prístup k predprimárnemu vzdelávaniu a vytvoriť pre nich optimálne podmienky pre výchovno-vzdelávací proces. CIELE PROJEKTU Hlavný cieľZabezpečiť deťom v predškolskom veku kvalitný prístup k predprimárnemu vzdelávaniu prostredníctvom rekonštrukcie a rozšírenia kapacity materskej školy v obci Ďurkov. Špecifické ciele:1. Zabezpečiť dostatočné priestorové podmienky materskej školy.2. Vytvoriť optimálne podmienky v rámci procesu výchovy, vzdelávania a starostlivosti pre deti so špeciálnym dôrazom na marginalizované rómske komunity. Uvedené špecifické ciele sú plne v súlade so špecifickým cieľom 6.1.2 Zlepšiť prístup ku kvalitnému vzdelávaniu vrátane vzdelávania a starostlivosti v rannom detstve v rámci OP Ľudské zdroje. Vytvoríme vhodné podmienky pre účasť detí z MRK v predprimárnom stupni vzdelávania, ktoré považujeme za kľúčové pri ich ďalšom osobnostnom a vzdelanostnom raste. Pre deti z MRK je nesmierne dôležité a to najmä v období ranného detstva v rámci ich socializácie a integrácie do spoločnosti získavať dôležité a cenné poznatky, ktoré nadobudnú počas predprimárneho vzdelávania. Okrem toho si osvoja základné hygienické návyky, prvky slušného správania a postupného začleňovania sa do spoločenského života. Mnohé z týchto detí žijú v žalostných podmienkach, čo má negatívny dopad na ich osobnostný rozvoj, vzdelanie a správanie.Sekundárnym cieľom je zníženie energetickej náročnosti objektu materskej školy, ktorý sa týka environmentálnej oblasti, ale taktiež ho považujeme za dôležitý s ohľadom na ochranu životného prostredia, t. j. zníženie emisií skleníkových plynov, zníženie ročnej spotreby primárnej energie. AKTIVITY PROJEKTU Projekt bude realizovaný prostredníctvom hlavnej aktivity - Rekonštrukcia budovy materskej školy/elokovaného pracoviska za účelom rozšírenia jej kapacity prístavbou, nadstavbou, rekonštrukciou, zmenou dispozície objektov, v rámci ktorej sa uskutočnia nasledovné činnosti: Činnosť 1: Rekonštrukcia objektu materskej školy za účelom zvýšenia jej kapacity, zníženia energetickej náročnosti objektu a predĺženia životnosti objektu.Činnosť 2: Dodávka a montáž interiérového vybavenia. MIESTO REALIZÁCIE- objekt sa nachádza v katastrálnej oblasti Ďurkov, na parcele 376 (LV č.62), nachádza sa vo výhodnej geografickej polohe v centre obce s dobrým prístupom zo všetkých častí obce HARMONOGRAM09 /2016 - termín začatia realizácie projektu03/2017 - termín ukončenia realizácie projektu MERATEĽNÉ UKAZOVATELE PROJEKTU PO067 - Kapacita podporenej školskej infraštruktúry MŠ/ Kapacita podporovaných zariadení starostlivosti o deti alebo vzdelávacej infraštruktúry – 60 detíPO373 - Počet renovovaných predškolských zariadení v obciach s prítomnosťou MRK – 1 budovaPO105 - Odhadované ročné zníženie emisií skleníkových plynov v renovovaných budovách - 30,851 t/a (Odhadované ročné zníženie emis ií z hodnoty 35,711 t/a na hodnotu 4,86 t/a CO2 predstavuje úsporu 30,851 t/a)PO698 - Zníženie ročnej spotreby primárnej energie v renovovaných verejných budovách - 196927,67 kWh/a​ (Zníženie ročnej s potreby primárnej energie v renovovaných verejných budovách z hodnoty 242760,17 kWh/a na hodnotu 45832,50 kWh/a predstvuje úsporu 196927,67 kWh/a)PO716 - Počet detí z MRK, ktoré navštevujú podporenú školskú infraštruktúru materských škôl - 28 detí (Slovak)
    0 references
    Summary OF BUSINESS POPIS PROJECTS In the village of Ďurkov there is a kindergarten, which is situated near the municipal office. The building of the kindergarten requires reconstruction due to insufficient capacity and poor technical condition. At present, we cannot accommodate all those interested in placing their children in kindergarten for capacity reasons. This poor situation with limited capacity and lack of facilities also means that children from marginalised Roma communities (similar to other children under 5) often do not reach kindergarten or have irregular attendance. Pre-school education and care is particularly important for children from CLLD. Most of these children grow up in an environment that puts them at a disadvantage in personal progress and living conditions. Many of them do not have hygiene habits, elements of decent behaviour and thus have difficulty in integrating into social life. This also results in increasing tensions between the Roma population and the majority society, as they are problematic and unadaptable from their point of view. By implementing the project, we will achieve the expansion of the capacity of the kindergarten in our village and thus fulfil the main objective of the project, i.e. to ensure quality access to pre-primary education for children of pre-school age and to create optimal conditions for the educational and educational process for them. Objectives PROJECT The main objectiveEnsure quality access to pre-primary education to pre-school children through the reconstruction and expansion of the capacity of the kindergarten in the village of Ďurkov. Specific objectives:1. Ensure sufficient space conditions for kindergarten.2. Create optimal conditions in the process of upbringing, education and care for children, with special emphasis on marginalised Roma communities. Those specific objectives are fully in line with specific objective 6.1.2 Improve access to quality education, including early childhood education and care, under the Human Resources OP. We will create suitable conditions for the participation of children from CLLD in pre-primary education, which we consider to be crucial for their further personal and educational growth. It is extremely important for children from CLLD, especially during early childhood, as part of their socialisation and integration into society, to acquire important and valuable knowledge acquired during pre-primary education. In addition, they will adopt basic hygiene habits, elements of decent behaviour and gradual integration into social life. Many of these children live in deplorable conditions, which has a negative impact on their personal development, education and behaviour.The secondary goal is to reduce the energy intensity of a kindergarten building that concerns the environmental field, but we also consider it important with regard to environmental protection, i.e. reducing greenhouse gas emissions, reducing annual primary energy consumption. The project will be implemented through the main activity – Reconstruction of the building of the kindergarten/specialised workplace in order to expand its capacity by extension, superstructure, reconstruction, change of layout of buildings, within which the following activities will be carried out: Action 1: Reconstruction of the building of the kindergarten in order to increase its capacity, reduce the energy intensity of the object and extend the life of the building.Activities 2: Supply and installation of interior equipment. Place REALISATION- the building is located in the cadastral area of Ďurkov, on plot 376 (LV No. 62), located in a convenient geographical location in the center of the village with good access from all parts of the village HARMONOGRAM09/2016 – date of start of project implementation03/2017 – date of completion of project implementation measurable UKAZOVATELE PROJECT PO067 – Capacity of supported school infrastructure MŠ/Capacity of supported childcare facilities or educational infrastructure – 60 childrenPO373 – Number of renovated pre-school facilities in municipalities with the presence of MRK – 1 buildingPO105 – Estimated annual greenhouse gas emission reduction in refurbished buildings – 30,851 t/a (Estimated annual emission reduction from 35.711 t/and to 4.86 t/and CO2 represents savings of 30.851 t/a)PO698 – Reduction of annual primary energy consumption in refurbished public buildings – 196927,67 kWh/a (Reduction of annual primary energy needs in refurbished public buildings from 242760.17 kWh/a to 45832.50 kWh/a)PO716 – Number of children from MRK attending supported kindergarten infrastructure – 28 children (English)