Hořice — footbridge on road I/35 (Q62680)

From EU Knowledge Graph
Revision as of 11:33, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Cross-crossing of the footpath towards the pedestrian and cyclist through the first class E442 class E (I/35) connecting the local part of Libonne and the municipalities to the south-west with the town of Hořice., Adding English summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Hořice — footbridge on road I/35
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,999,999.99 Czech koruna
    0 references
    199,999.9996 Euro
    1 October 2020
    0 references
    5,263,157.89 Czech koruna
    0 references
    210,526.3156 Euro
    1 October 2020
    0 references
    94.9999998955 percent
    0 references
    27 May 2015
    0 references
    30 September 2018
    0 references
    30 September 2018
    0 references
    Město Hořice
    0 references
    0 references
    50801
    0 references
    Mimoúrovňové křížení stezky pro pěší a cyklisty přes frekventovanou mezinárodní silnici první třídy E442 (I/35), která propojí místní část Libonice a obce na jihozápad s městem Hořice. (Czech)
    0 references
    Cross-crossing of the footpath towards the pedestrian and cyclist through the first class E442 class E (I/35) connecting the local part of Libonne and the municipalities to the south-west with the town of Hořice. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0007823
    0 references