Sihelné MŠ boiler room – change of fuel base (Q3110660)

From EU Knowledge Graph
Revision as of 14:47, 27 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 0.85 percent)
Jump to navigation Jump to search
Project Q3110660 in Slovakia
Language Label Description Also known as
English
Sihelné MŠ boiler room – change of fuel base
Project Q3110660 in Slovakia

    Statements

    0 references
    87,714.54 Euro
    0 references
    103,193.58 Euro
    0 references
    3 January 2019
    0 references
    7 January 2019
    0 references
    Obec Sihelné
    0 references
    0 references

    49°30'15.59"N, 19°25'20.57"E
    0 references
    Lokalita stavby sa nachádza v kat. území Sihelné, v centrálnej časti obce, v priemerne urbanizovanomvidieckom prostredí. Existujúca stavba je situovaná v areáli spojenom s detským ihriskom. Pozemok je svahovitý, porastený solitérmi listnatých stromov, ohraničený susednými stavbami a existujúcim oplotením. Dopravne je stavebný pozemok prístupný existujúcim spevneným vjazdom z južnej strany pozemku. Existujúca stavba je situovaná na pozemku, ktorý je vlastníctvom investora a je vedený ako zastavaná plocha.Účelom akcie je zmena palivovej základne existujúcej kotolne na tuhé palivo, ktorá je v prevádzke už odroku 1975 a v súčasnosti je v nevyhovujúcom technickom stave. Projekt rieši rekonštrukciu existujúceho tepelného zdroja na báze fosílnych palív na zariadenie využívajúce biomasu. Podkladom pre spracovanie projektu bola výzva pre Operačný program Kvalita životného prostredia, ktorej cieľom je zvýšenie podielu obnoviteľných zdrojov na hrubej konečnej energetickej spotrebe SR. Objekt MŠ sa nachádza v intraviláne obce Sihelné, v centrálnej časti obce. Objekt kotolne sa nachádza v prízemí pavilónu B.V kotolni sú inštalované 3 ks liatinových kotlov na pevné palivo VSB IV o celkovom výkone 300 kW. Ohrev teplej vody je riešený v 3 ks ležatých ohrievačoch vody o objeme 2x1600, resp. 500 litrov, ktoré sú nefunkčné. Potreba tepla vykurovaných objektov bude pokrytá pomocou 2 ks kotlov na pelety Froling Pellet P4 80 o výkone 24 - 80 kW. Kotle budú umiestnené v priestoroch existujúcej kotolne, budú zaústené do existujúcich komínových prieduchov, ktoré sa vyvložkujú.Projekt si vyžaduje malé búracie práce a následne stavebné úpravy. Rekonštrukcia elektrických rozvodov takmer žiadna s výnimkou napojenia nových kotlov a bezpečnostného systému. (Slovak)
    0 references
    The location of the building is located in the Kat. Territory of Sihelné, in the central part of the village, in an average urban environment. The existing building is situated in the area connected with the playground. The land is sloping, covered with solitaires of deciduous trees, bordered by neighboring buildings and existing fences. Traffic is a building plot accessible by the existing paved entrance from the south side of the land. The existing building is situated on the land, which is the property of the investor and is kept as a built-up area.The purpose of the action is to change the fuel base of the existing boiler room to solid fuel, which has been in operation since 1975 and is currently in poor technical condition. The project addresses the reconstruction of an existing fossil fuel-based heater into a biomass-based installation. The basis for the project was the call for the Operational Programme Quality of the Environment, which aims to increase the share of renewable resources in the gross final energy consumption of the Slovak Republic. The building MŠ is located in the village Sihelné, in the central part of the village. The boiler house is located on the ground floor pavilion B.In the boiler room are installed 3 pieces of cast iron solid fuel boilers VSB IV with a total output of 300 kW. Hot water heating is designed in 3 pieces of lying water heaters with a volume of 2x1600, or 500 liters, which are inoperable. The heat needs of heated objects will be covered by 2 pcs pellet boiler Froling Pellet P4 80 with output of 24-80 kW. Boilers will be located in the existing boiler room, they will be connected to existing chimney vents, which are inserted. The project requires small demolition work and subsequent construction modifications. Reconstruction of electrical wiring almost none except connection of new boilers and safety system. (English)
    15 September 2021
    0 references

    Identifiers

    310041P609
    0 references