Modernisation, expansion and increase of energy efficiency of the public lighting network in Moldova Noua (Q2744676)

From EU Knowledge Graph
Revision as of 11:45, 27 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying co-finance rate with the percentage)
Jump to navigation Jump to search
Project Q2744676 in Romania
Language Label Description Also known as
English
Modernisation, expansion and increase of energy efficiency of the public lighting network in Moldova Noua
Project Q2744676 in Romania

    Statements

    0 references
    9,286,135.65 Romanian Leu
    0 references
    1,857,227.1300000001 Euro
    13 September 2021
    0 references
    10,924,865.46 Romanian Leu
    0 references
    2,184,973.092 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 June 2018
    0 references
    1 August 2022
    0 references
    ORASUL MOLDOVA NOUA
    0 references
    0 references
    Obiectivul general al proiectului este cresterea eficientei enegetice a sistemului de iluminat public din orasul Moldova Noua, judetul Caras-Severin si reducerea emisiilor de CO2. Acest lucru va fi realizat prin asigurarea unui sistem de iluminat modern, cu eficienta luminoasa si energetica ridicata, cu o durata de viata mare (minim 100.000 ore), cu cheltuieli de intretinere si exploatare reduse, contribuind in acelasi timp la reducerea cheltuielilor cu energia electrica si la reducerea emisiilor de CO2 prin utilizarea de aparate de iluminat eficiente. In consecinta: 1.Se va extinde iluminatul public pe o lungime totala de 3140 ml astfel: -De la Service ,,Auto Alex” la pârâul Pîrva Reka pe D.N. 57, spre Oravița = 555,23 m -De la stadionul Dunărea până la drum acces punct trecere frontieră (Bac), pe D.N. 57 spre Orșova, zona Iegodărie (partea stângă) = 847,27 m -Drum acces la punctul de trecere a frontierei (Bac), din DN - 57 = 680 m -De la casa familială Bencze Laslo, soseaua Dunarii, nr. 163, la statia de Pompe si apoi iesirea la DN 57 =1058 m 2. Va fi achizitionat si instalat un sistem de telegestiune a iluminatului public; 3. Se vor monta 142 stalpi de iluminat cu un panou fotovoltaic de 225 W; 4. Se vor monta în fundatie de beton 253 buc stalpi metalici noi, zincati, cu înaltimea de 4 m si 105 buc stalpi metalici cu inaltimea de 8 m pentru extinderi; 5. Pentru realizarea iluminatului se vor monta pe stalpii nou proiectati 1167 corpuri de iluminat de tip LED - cate unul pe fiecare stalp - de tip LED 27 W, 60 W si 80 W; 6. Se vor monta 4 puncte de aprindere care vor comanda iluminatul public pentru extinderi; 7. Se vor monta panouri de semnalizare cu actionare prin butoane montate la inaltimea de 1-1,2 m de la sol pentru a putea fi actionate cu usurinta de catre persoanele cu dizabilitati; In concluzie, scopul proiectului este acela de creste eficienta Sistemului de Iluminta Public al Orasului Moldova Noua. (Romanian)
    0 references
    The general objective of the project is to increase the enegetic efficiency of the public lighting system in the city of Moldova Noua, Caras-Severin county and to reduce CO2 emissions. This will be achieved by providing a modern lighting system with high bright and energy efficiency, with a long lifespan (minimum 100,000 hours), with reduced maintenance and operation costs, while helping to reduce electricity costs and reduce CO2 emissions through the use of efficient lighting devices. Consequently: 1.Extend public lighting on a total length of 3140 ml as follows: —From Service “Auto Alex” to the river Pîrva Reka on D.N. 57, towards Oravița = 555.23 m -From the Danube stadium to the road border crossing point (Bac), on D.N. 57 to Orșova, Iegoderie area (left) = 847,27 m -Drum access to the border crossing point (Bac), from DN 57 = 680 m -From family house Bencze Laslo, Danube road, No 163, to Pompe station and then exit to DN 57 = 1058 m 2. A public lighting remote management system will be purchased and installed; 3. 142 lighting poles will be fitted with a 225 W photovoltaic panel; 4. Will be mounted in the concrete foundation 253 pcs new metal poles, galvanised, with a height of 4 m and 105 pcs metal poles with height of 8 m for extensions; 5. 1167 LED luminaires – one on each pole – of the type LED 27 W, 60 W and 80 W; 6. 4 flashpoints will be fitted to order public lighting for extensions; 7. The signalling panels will be mounted by buttons mounted at the height of 1-1.2 m from the ground so that they can be easily operated by people with disabilities; In conclusion, the aim of the project is to increase the efficiency of the Public Enlightenment System of the City of Moldova Noua. (English)
    14 September 2021
    0 references
    Oraş Moldova Nouă, Romania