Broadband infrastructure in the white NGA areas of Bihor county (Q3098993)

From EU Knowledge Graph
Revision as of 11:04, 27 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 0.77 percent)
Jump to navigation Jump to search
Project Q3098993 in Romania
Language Label Description Also known as
English
Broadband infrastructure in the white NGA areas of Bihor county
Project Q3098993 in Romania

    Statements

    0 references
    7,450,093.93 Romanian Leu
    0 references
    1,490,018.786 Euro
    13 September 2021
    0 references
    9,738,684.87 Romanian Leu
    0 references
    1,947,736.974 Euro
    13 September 2021
    0 references
    4 January 2019
    0 references
    3 January 2022
    0 references
    INVITE SYSTEMS SRL
    0 references
    0 references
    Obiectivul principal al proiectului este dezvoltarea infrastructurii de internet in banda larga, in zonele albe NGA din judetul Bihor, cu o larga răspândire a nodurilor de comunicaţii şi partea de transmisie a datelor (backbone şi blackhaul), cât mai aproape de utilizatorul final și cu niveluri adecvate de simetrie și de interactivitate, pentru a garanta transmitere mai bună de informații în ambele sensuri. Prin introducerea conexiunii de tip Next Generation Access se va facilita accesul la internet pentru echipamente moderne TIC, rezultand consolidarea infrastructurii TIC, si se asigura accesul public la infrastructura nationala informationala si in zonele albe NGA. Proiectul va asigura utilizatorilor finali obiectivele minime de calitate, respectiv: a. viteze de transfer (download) a datelor în regim ”best effort” – minim 30 Mbps; b. grad de disponibilitate a serviciului de acces la internet - > 99% din timpul serviciului c. latența - ≤ 100ms, cu excepția tehnologiei prin satelit, unde poate fi ≤ 700ms d. jitter ≤ 50 ms De asemenea, in furnizarea serviciilor realizate in cadrul proiectului, se va respecta legislatia in domeniul comunicatiilor electronice si se va oferi acces deschis la rețelele de comunicații electronice și la infrastructurile fizice aferente acestora, in conformitate cu prevederile Ghidului si cu Decizia Președintelui ANCOM nr. 502/2018. (Romanian)
    0 references
    The main objective of the project is to develop the broadband internet infrastructure in the NGA white areas of Bihor County, with a wide spread of communication nodes and the data transmission part (backbone and blackhaul), as close as possible to the end user and with adequate levels of symmetry and interactivity, in order to guarantee better transmission of information in both directions. By introducing the Next Generation Access connection, we will facilitate access to the internet for modern ICT equipment, resulting in the strengthening of the ICT infrastructure, and ensure public access to the national information infrastructure and in the white NGA areas. The project will ensure the minimum quality objectives for end-users, namely: a. “best effort” data download speeds – minimum 30 Mbps; b. availability of the internet access service – > 99 % of the service time c. latence – ≤ 100ms, except for satellite technology, where it can be ≤ 700ms d. jitter ≤ 50 ms. Also, in the provision of the services performed within the project, the legislation in the field of electronic communications will be complied with and open access to the electronic communications networks and the related physical infrastructures will be provided, in accordance with the provisions of the Guide and Decision No 502/2018 of the President of ANCOM. (English)
    16 September 2021
    0 references
    Oraş Voluntari, Romania
    0 references
    Şimian, Romania
    0 references
    Tarcea, Romania
    0 references
    Sălard, Romania
    0 references
    Sălacea, Romania
    0 references
    Buduslău, Romania
    0 references
    Bratca, Romania
    0 references
    Aştileu, Romania
    0 references
    Ciuhoi, Romania
    0 references
    Municipiul Ploieşti, Romania
    0 references

    Identifiers

    126957
    0 references