Awards for the development of urban water management stage III (Q3057400)

From EU Knowledge Graph
Revision as of 10:44, 27 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 0.69 percent)
Jump to navigation Jump to search
Project Q3057400 in Latvia
Language Label Description Also known as
English
Awards for the development of urban water management stage III
Project Q3057400 in Latvia

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    453,531.87 Euro
    0 references
    655,063.85 Euro
    0 references
    5 December 2017
    0 references
    4 December 2021
    0 references
    Balvu novada pašvaldības aģentūra "SAN-TEX"
    0 references
    0 references
    0 references

    57°7'35.80"N, 27°16'34.36"E
    0 references

    57°8'34.44"N, 27°15'35.35"E
    0 references

    57°7'32.02"N, 27°15'3.67"E
    0 references

    57°7'56.03"N, 27°16'40.44"E
    0 references

    57°7'35.87"N, 27°15'3.85"E
    0 references

    57°8'36.13"N, 27°15'36.76"E
    0 references

    57°8'31.67"N, 27°15'37.33"E
    0 references

    57°7'53.83"N, 27°16'47.71"E
    0 references

    57°8'4.60"N, 27°15'41.22"E
    0 references

    57°7'39.65"N, 27°15'23.36"E
    0 references

    57°7'35.80"N, 27°16'34.36"E
    0 references

    57°8'27.17"N, 27°14'46.21"E
    0 references

    57°7'27.48"N, 27°16'41.56"E
    0 references

    57°7'28.20"N, 27°15'28.15"E
    0 references
    Projekta mērķis ir attīstīt un nodrošināt centralizētās ūdensapgādes un sadzīves kanalizācijas sistēmu pakalpojumu kvalitāti, vienlaicīgi uzlabojot to pieejamību Balvu pilsētas notekūdeņu aglomerācijā. Projekts mērķis ir samazināt apkārtējā vidē novadīto piesārņojumu, ko rada individuālo dzīvojamo māju un saimniecību decentralizētie kanalizācijas sistēmu objekti.Publisko iepirkumu par jaunu ūdensvada un saimnieciski fekālās kanalizācijas tīklu izbūvi Balvu pilsētā. paredzēts veikt 2017.-2018.gados. Būvdarbu veikšana paredzēta 2018.-2019.gadā. Projekta kopējās izmaksas sastāda 1646121.27 EUR, t.sk. attiecināmās izmaksas 655063.85 EUR, no kurām Kohēzijas fonda finansējums 453531.87EUR. Projekta īstenošanas laikā sasniedzamais rādītājs - papildus pieslēdzamais centralizēto ūdensvada un sadzīves kanalizācijas pakalpojumu izmantotāju skaits ir 313 iedzīvotāji. Saskaņā ar SIA "WESEMANN" izstrādāto būvprojektu "Balvu pilsētas ūdenssaimniecības attīstība III kārta" kopējais izprojektēto ūdensvadu (maģistrāļu) kopgarums ir 4082 metri, bet kopējais izprojektēto kanalizācijas (maģistrāļu) kopgarums ir 3867 metri. Projekts paredz trīs jaunu kanalizācijas pārsūknēšanas staciju ( Celtnieku, Miera un Kooperatoru ielās) izbūvi. Ņemot vēra, ka projektā ir neizlietotais finansējums tiek veikti papildus darbi : Ķiršu ielā Balvos jauna ūdensvada (450 m )un sadzīves kanalizācijas ( 430 m ) tīklu būvniecība.Projekta īstenošanas ilgums - 48 mēneši. (Latvian)
    0 references
    The aim of the project is to develop and ensure the quality of services of centralised water supply and domestic sewerage systems, at the same time improving their availability in Balvi city wastewater agglomeration. The aim of the project is to reduce the pollution discharged into the environment by the decentralised sewerage systems of individual residential houses and farms.Public procurement for construction of new water supply and economical sewerage networks in Balvi city. Scheduled for 2017-2018. Construction works are planned for 2018-2019. The total cost of the project is EUR 1646121.27, including eligible costs EUR 655063.85, of which Cohesion Fund funding EUR 453531.87. The indicator to be achieved during the implementation of the project – the additional connected number of users of centralised water supply and household sewerage services is 313 inhabitants. According to “Wesemann” Ltd. construction project “Development of Water Management of the City of the Baltics – Round III” the total length of the designed water pipes (masterways) is 4082 metres, but the total length of the planned drainage (ma highways) is 3867 metres. The project envisages the construction of three new sewage pumping stations (on the streets of Celtnieki, Peace and Cooperators). Taking into account that the project has unspent funding, additional work is being carried out: Construction of new water mains (450 m) and household sewerage (430 m) in Balvi.Project implementation duration – 48 months. (English)
    15 July 2021
    0 references
    Celtnieku iela, Balvi, Balvu nov.
    0 references
    Celtnieku iela, Balvi, Balvu nov.
    0 references
    Celtnieku iela, Balvi, Balvu nov.
    0 references
    Pilsoņu iela, Balvi, Balvu nov.
    0 references
    Ziedu iela, Balvi, Balvu nov.
    0 references
    Partizānu iela, Balvi, Balvu nov.
    0 references
    Bērzu iela, Balvi, Balvu nov.
    0 references
    Bērzu iela, Balvi, Balvu nov.
    0 references
    Bērzu iela, Balvi, Balvu nov.
    0 references
    Dārza iela, Balvi, Balvu nov.
    0 references
    Dārza iela, Balvi, Balvu nov.
    0 references
    Miera iela, Balvi, Balvu nov.
    0 references
    Pļavu iela, Balvi, Balvu nov.
    0 references
    Pļavu iela, Balvi, Balvu nov.
    0 references
    Pļavu iela, Balvi, Balvu nov.
    0 references
    Zaļā iela, Balvi, Balvu nov.
    0 references
    Zaļā iela, Balvi, Balvu nov.
    0 references
    Zaļā iela, Balvi, Balvu nov.
    0 references
    Ķiršu iela, Balvi, Balvu nov.
    0 references
    Kooperatoru iela, Balvi, Balvu nov.
    0 references
    Lauku iela, Balvi, Balvu nov.
    0 references
    Miera iela, Balvi, Balvu nov.
    0 references
    Stacijas iela 15, Balvi, Balvu nov., LV-4501
    0 references
    Ceļinieku iela 22, Balvi, Balvu nov., LV-4501
    0 references

    Identifiers

    5.3.1.0/17/I/007
    0 references