Building up of an additional network of the ECKROKROZPROJKPROJECKZKZKJKZKJKZKJKZKJKZKOL@@ (Q57646)

From EU Knowledge Graph
Revision as of 10:11, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): This project aims at expanding the charging infrastructure for electric vehicles. An AC of 18 conventional AC stations will be built, with a maximum output of 22 kW in selected locations in the North-East of the Czech Republic. Recharging points will be built on leased land. The project will start after the adoption of the legal act under the assumption 2.1.2019 and will last until 31.12.2020. The aid intensity requested is 70 %. The total elig...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Building up of an additional network of the ECKROKROZPROJKPROJECKZKZKJKZKJKZKJKZKJKZKOL@@
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,393,165.2 Czech koruna
    0 references
    55,726.608 Euro
    10 January 2020
    0 references
    1,990,236.0 Czech koruna
    0 references
    79,609.44 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    31 December 2020
    0 references
    ELEKTRO-PROJEKCE s.r.o.
    0 references
    0 references

    49°49'6.74"N, 18°15'47.92"E
    0 references

    49°48'34.92"N, 18°15'48.89"E
    0 references
    70300
    0 references
    Tento projekt je zaměřen na rozšíření nabíjecí infrastruktury pro vozidla na elektrický pohon. Bude vybudováno 18 běžných dobíjecích stanic typu AC s výkonem max. 22 kW ve vybraných lokalitách v severovýchodní části České republiky. Dobíjecí stanice budou vybudovány na pronajatých pozemcích. Projekt bude zahájen po vydání právního aktu s předpokladem 2.1.2019 a bude trvat do 31.12.2020. Požadovaná intenzita podpory je 70 %. Celkové způsobilé výdaje jsou 2 195 179 Kč bez DPH. (Czech)
    0 references
    This project aims at expanding the charging infrastructure for electric vehicles. An AC of 18 conventional AC stations will be built, with a maximum output of 22 kW in selected locations in the North-East of the Czech Republic. Recharging points will be built on leased land. The project will start after the adoption of the legal act under the assumption 2.1.2019 and will last until 31.12.2020. The aid intensity requested is 70 %. The total eligible expenditure is CZK 2 195 179, exclusive of VAT. (English)
    0 references

    Identifiers

    CZ.04.2.40/0.0/0.0/16_036/0000228
    0 references