Improvement of energy efficiency of the Jūrmala City Kauguru Secondary School building (Q3057131)

From EU Knowledge Graph
Revision as of 09:37, 27 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying co-finance rate with the percentage)
Jump to navigation Jump to search
Project Q3057131 in Latvia
Language Label Description Also known as
English
Improvement of energy efficiency of the Jūrmala City Kauguru Secondary School building
Project Q3057131 in Latvia

    Statements

    0 references
    512,648.6 Euro
    0 references
    1,094,020.57 Euro
    0 references
    46.86 percent
    0 references
    20 December 2018
    0 references
    31 March 2020
    0 references
    Jūrmalas pilsētas dome
    0 references
    0 references

    56°57'40.97"N, 23°36'45.14"E
    0 references
    Projekta mērķis - samazināt primārās enerģijas gada patēriņu Kauguru vidusskolas ēkā, Raiņa ielā 118, Jūrmalā par 76,46 kWh/m2, veicot ieguldījumus pašvaldības ēkā sekmēt energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi. Projekta ietvaros plānots veikt šadus pasākumus: 1. Ēkas fasādes ārsienu, pamatu, cokola un aiļu siltināšanu; 2. Augšējā pārseguma (jumta plaknes) siltināšanu, jauna jumta seguma izveidošana; 3. Veco koka logu, PVC logu sporta zālē un durvju nomaiņu uz jauniem blīviem logiem un durvīm;4. Apkures sistēmas pārbūvi, t.sk. siltummezgla modernizāciju;5. Jauna LED tipa energoefektīva apgaismojuma uzstādīšanu un jaunu iekšējās elektroinstalācijas sistēmas izbūvi. Projekta īstenošanas rezultātā plānotais vidējais siltumenerģijas patēriņš apkurei pēc renovācijas – 66,01 kWh/m2 gadā, primārās enerģijas gada patēriņa samazinājums pēc darbu pabeigšanas – 76,46 kWh/m2 gadā, aprēķinātais siltumnīcefekta gāzu samazinājums gadā (CO2 ekvivalents tonnās) – 107,78 t gadā, kā arī veikta ēkas ar kopējo platību 5098,400 m2 energoefektivitātes paaugstināšana. Projekta kopējās izmaksas -1 444 644.39 EUR, t.sk. Eiropas Reģionālās attīstības fonda līdzfinansējums - 512 648,60 EUR; Valsts budžeta dotācija - 87 204,38 EUR; Pašvaldības finansējums - 494 167,59 EUR Neattiecināmās izmaksas - 350 623.82EUR.Projektu plānots īstenot 16 (sešpadsmit) mēnešos. (Latvian)
    0 references
    The aim of the project – to reduce the annual consumption of primary energy in Kauguru Secondary School building, Raiņa street 118, Jurmala by 76.46 kWh/m², by investing in municipal building to promote energy efficiency and reduction of municipal expenditure on heating. Within the project it is planned to take the following measures: 1. Insulation of facade walls, foundations, plinths and columns of the building; 2. Insulation of upper cover (roof plane), creation of new roofing; 3. Replacement of old wooden windows, PVC windows in the gym and doors to new dense windows and doors;4. Reconstruction of the heating system, including modernisation of the heating unit;5. Installation of new LED-type energy efficient lighting and construction of new internal wiring system. The project results in the planned average heat consumption for heating after renovation – 66,01 kWh/m² per year, reduction of annual primary energy consumption after completion of works – 76.46 kWh/m² per year, estimated annual greenhouse gas reduction (CO2 equivalent tons) – 107.78 t per year, as well as improvement of energy efficiency of a building with a total area of 5098.400 m². Total cost of the project – EUR 1444644.39, incl. Co-financing from the European Regional Development Fund – EUR 512648,60; State budget grant – EUR 87204,38; Municipal funding – EUR 494167,59 ineligible costs – EUR 350623.82. The project is planned to be implemented in 16 (sixteen) months. (English)
    15 July 2021
    0 references
    Raiņa iela 118, Jūrmala, LV-2016
    0 references

    Identifiers

    4.2.2.0/18/I/011
    0 references