Reducing the energy intensity of buildings: Maternity rounds Hrnčiarska and Maternity rounds Fullu in Zvolen (Q3100692)

From EU Knowledge Graph
Revision as of 21:04, 23 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3100692 in Slovakia
Language Label Description Also known as
English
Reducing the energy intensity of buildings: Maternity rounds Hrnčiarska and Maternity rounds Fullu in Zvolen
Project Q3100692 in Slovakia

    Statements

    0 references
    945,949.07 Euro
    0 references
    1,112,881.26 Euro
    0 references
    0.85 percent
    0 references
    1 April 2017
    0 references
    1 May 2018
    0 references
    Mesto Zvolen
    0 references
    0 references

    48°34'36.08"N, 19°9'16.96"E
    0 references
    Ciežom projektu s názvom „Zníženie energetickej náročnosti budov: Materská škola Hrnčiarska a Materská škola Fullu vo Zvolene“ je zníženie spotreby energie pri prevádzke budov materských škôl realizáciou opatrení, ktoré vyplývajú z energetického auditu. Žiadatežom o poskytnutie nenávratného finančného príspevku na realizáciu predkladaného projektu je Mesto Zvolen, ako majitež budovy a pozemku a zriaďovatež materskej školy.Ciežovou skupinou sú zamestnanci materských škôl, deti navštevujúce tieto predškolské zariadenia a ich rodičia. Projekt bude realizovaný prostredníctvom dvoch hlavných aktivít a podporných aktivít projektu. Miestom realizácie projektu je MŠ na Hrnčiarskej ulici č. 2063/2 MŠ a MŠ na Ulici ź. Fullu č. 1689/43.V dôsledku realizácie projektu dôjde k obnove dvoch verejných budovy nad rámec minimálnych požiadaviek s celkovou podlahovou plochou 3333 m2. Realizáciou projektu dôjde ku zníženiu potreby energie v budovách (rozdiel medzi celkovou ročnou potrebou energie pred a po realizácii opatrení energetickej efektívnosti) o 276700 kWh/rok, pričom merná potreba energie na vykurovanie sa zníži pri MŠ Hrnčiarka zo 120 kWh/(m2.a) na 21 kWh/(m2.a), teda o 82,5 % a pri MŠ ź. Fullu z 112 kWh/(m2.a) na 22 kWh/(m2.a), teda o 80,4 %. Po ukončení realizácie projektu budú obidve budovy zaradené v energetickej triede A1. (Slovak)
    0 references
    The aim of the project "Reducing the energy intensity of buildings: The Maternity Round of Hrnčiarska and Materská Round Fullu in Zvolen is the reduction of energy consumption during the operation of the buildings of the mother rounds by implementing measures resulting from the energy audit. The request to provide a non-repayable financial contribution for the implementation of the present project is the City of Zvolen, as the owner of the building and land and set up the Maternity Koly. The main group are employees of the maternity rounds, children visiting these preschool facilities and their parents. The project will be implemented through two main activities and project support activities. The place of implementation of the project is M on Hrnčiarská Street No. 2063/2 M and M in Street ź. Fullu No. 1689/43.As a result of the implementation of the project, two public buildings will be renovated beyond the minimum requirements with a total floor area of 3333 m². The project will reduce the energy demand in buildings (difference between the total annual energy demand before and after the implementation of energy efficiency measures) by 276700 kWh/year, while the specific energy demand for heating is reduced for M potter from 120 kWh/(m².a) to 21 kWh/(m².a), i.e. 82.5 % and M ź. Fullu from 112 kWh/(m².a) to 22 kWh/(m².a) or 80.4 %. After the completion of the project, both buildings will be classified in energy class A1. (English)
    15 September 2021
    0 references

    Identifiers

    310041A562
    0 references