Mother’s round, Ul. railway line 3, Levoča, Elocated workplace, Ul. GA para Haina 36, Levoča reducing the energy intensity of public buildings (Q3100683)
Jump to navigation
Jump to search
Project Q3100683 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Mother’s round, Ul. railway line 3, Levoča, Elocated workplace, Ul. GA para Haina 36, Levoča reducing the energy intensity of public buildings |
Project Q3100683 in Slovakia |
Statements
505,998.51 Euro
0 references
595,292.37 Euro
0 references
0.85 percent
0 references
1 August 2017
0 references
1 May 2018
0 references
Mesto Levoča
0 references
Predmetom projektu je zníenie energetickej náročnosti budovy Materskej koly nachádzajúcej sa na ulici G. Haina 36 v Levoči. Ciežom projektu je zníenie spotreby energie pri prevádzke objektu materskej koly G. Haina, čím sa zabezpečí zníenie nákladov na vykurovanie, predĺenie ivotnosti kontrukcií a hospodárnos budovy na úrovni nízkoenergetickej budovy. Hlavné aktivity projektu:- Zníenie energetickej náročnosti budovy M G. Haina SO 01- I. stupeň.- Zníenie energetickej náročnosti budovy M G. Haina SO 03- II. stupeň.V rámci uvedených aktivít sa zrealizuje zníenie spotreby energie zlepením tepelno-technických vlastností obvodového pláa, streného pláa a otvorových kontrukcií, vyregulovaním vykurovacej sústavy, zriadením rekuperácie, modernizáciou vnútorného osvetlenia a zavedením OZE pri výrobe tepla.Projektom sa dosiahne zníenie skleníkových plynov, zníi sa konečná spotreba a potreba energie v objektoch M, zníi sa produkcia NOx, PM 10, SO2 a zabezpečí sa zníenie ročnej spotreby primárnej energie, objekty budú zaradené z hžadiska potreby tepla do energetickej triedy A1. (Slovak)
0 references
The subject of the project is to reduce the energy intensity of the Materská Kola building located on G. Haina 36 in Levoča. The aim of the project is to reduce energy consumption during the operation of the G. Haina Maternity Wheel object, thereby ensuring that heating costs are reduced, the contrusion life is extended and the building is cost-effective at the low-energy building level. Main activities of the project:- Reducing the energy intensity of the building M G. Haina SO 01-I. degree.- Reducing the energy intensity of the building M G. Haina SO 03-II. Degree. Within the above activities, the reduction of energy consumption will be realised by improving the thermal-technical properties of the perimeter beach, the stiffened beach and open contrusions, regulating the heating system, by establishing recuperation, upgrading internal lighting and introducing RES in heat production.The project will achieve greenhouse gas reduction, reduce final consumption and energy demand in M objects, reduce NOx production, PM 10, SO2 and ensure the reduction of annual primary energy consumption, objects will be classified from the heat demand in energy class A1. (English)
15 September 2021
0 references
Identifiers
310041A536
0 references