Topožníky – Sewage and treatment of WWTP (Q3100615)

From EU Knowledge Graph
Revision as of 20:54, 23 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3100615 in Slovakia
Language Label Description Also known as
English
Topožníky – Sewage and treatment of WWTP
Project Q3100615 in Slovakia

    Statements

    0 references
    11,400,432.56 Euro
    0 references
    13,412,273.6 Euro
    0 references
    0.85 percent
    0 references
    1 February 2017
    0 references
    1 December 2020
    0 references
    OBEC Topožníky
    0 references
    0 references
    0 references

    47°58'13.76"N, 17°47'7.04"E
    0 references
    Na základe zistenia vysokej hladiny podzemných vôd - podloženými IG prieskumami z mája 2015 bola podmienená zmena návrhu v hĺbkovom uložení gravitačných kanalizačných stôk tak , aby v čo najminimálnejšom rozsahu zasahovali pod hladinu podzemných vôd. Projektová dokumentácia dodržala z 90% pôvodne navrhnuté trasovanie stôk splaškovej kanalizácie, s prepracovaním prietokov - podža prirodzeného spádu terénu , s prihliadnutím na zdokumentované hladiny podzemných vôd v zriadených sondách v rámci obce Topožníky. Projektová dokumentácia rieši v celo-obecnom meradle - odvádzanie splaškových vôd systémom gravitačných kanalizačných stôk - v kombinácii s návrhom osadenia 19 ks novo-navrhnutých prečerpávacích kanalizačných staníc, včetne výtlačných potrubí do najbližších kanalizačných šachiet - včetne napojenia IBV na celoobecnú kanalizáciu. Stavba bude slúži na odvedenie splaškových odpadových vôd zo záujmového územia obce - od nehnutežností v celoobecnom rozsahu - na budovanú čistiareň odpadových vôd v Topožníkoch. Stavba je z ekologického hžadiska významnou stavbou. (Slovak)
    0 references
    On the basis of the findings of the high groundwater level – the underlying IG surveys of May 2015, a change in the design of the deep storage of gravitational sewerage was made conditional on it reaching below the groundwater level to the minimum extent possible. Project documentation of 90 % originally designed route of sewage channels, with reworking of flows – under the natural slope of the terrain, taking into account documented groundwater levels in established probes within the village Topožníky. Project documentation on a whole-municipal scale – drainage of sewage by the system of gravity sewerage – in combination with the proposal to install 19 pcs of newly designed pumping sewer stations, including discharge pipes to the nearest sewer achets – including connections of IBV to the municipal sewerage system. The building will be used to remove sewage from the municipality’s interest area – from non-municipalities – to the built wastewater treatment plant in Topožníky. The building is an important building from the ecological hut. (English)
    15 September 2021
    0 references

    Identifiers

    310011A121
    0 references