Thermomodernisation of the office building in Radzyń Podlaski (Q2706112)

From EU Knowledge Graph
Revision as of 20:33, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: EU contribution (P835): 39,811.93 euro)
Jump to navigation Jump to search
Project Q2706112 in Poland
Language Label Description Also known as
English
Thermomodernisation of the office building in Radzyń Podlaski
Project Q2706112 in Poland

    Statements

    0 references
    0 references
    179,091.0 zloty
    0 references
    39,811.93 Euro
    0.2223 Euro
    0 references
    397,980.0 zloty
    0 references
    88,470.95 Euro
    0.2223 Euro
    0 references
    45.0 percent
    0 references
    1 August 2020
    0 references
    31 October 2021
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°46'32.5"N, 22°37'29.6"E
    0 references
    PEC Sp. z o.o. w Radzyniu Podlaskim funkcjonuje od lipca 1997r., w wyniku przekształcenia przedsiębiorstwa komunalnego w sp. z o.o. Założycielem spółki była Gmina Miejska Radzyń Podlaski, która pozostaje 100% udziałowcem Spółki. Istotą projektu jest głęboka termomodernizacja budynku socjalno - biurowego PEC Sp. zo.o. w Radzyniu Podlaskim. W ramach projektu przewidziano opracowanie dokumentacji przygotowawczej (audyt energetyczny oraz dokumentację techniczną), promocję projektu oraz termomodernizację budynku socjalno - biurowego obejmującą swoim zakresem: ocieplenie ścian zewnętrznych, wymianę stolarki okiennej i drzwiowej, ocieplenie stropodachu wentylowanego oraz stropu zewnętrznego, modernizację instalacji c.o. (wymiana grzejników, montaż zaworów termostatycznych oraz licznika energii cieplnej) wraz z regulacją hydrauliczną instalacji, wymianę opraw oświetleniowych na energooszczędne. Realizacja projektu ma przede wszystkim na celu zmniejszenie zużycia energii cieplnej oraz elektrycznej, co w efekcie doprowadzi do redukcji emisji zanieczyszczeń do powietrza oraz zmniejszenia kosztów eksploatacyjnych budynku. Cele projektu są zgodne z celami Osi priorytetowej 5, Działanie 5.1 RPO WL na lata 2014-2020. Projekt realizowany będzie w roku 2020. Rezultatem realizacji projektu będzie: - oszczędność energii cieplnej, oszczędność energii elektrycznej, zmniejszenie zużycia energii końcowej, spadek emisji gazów cieplarnianych oraz emisji PM10. Grupą docelową przedsięwzięcia jest PEC Sp. z o.o. w Radzyniu Podlaskim (Polish)
    0 references
    PEC Sp. z o.o. has been operating in Radzyń Podlaski since July 1997, as a result of the transformation of the municipal company into sp. z o.o. The founder of the company was the Municipality of Radzyń Podlaski, which remains 100 % shareholder of the Company. The essence of the project is the deep thermomodernisation of the social and office building PEC Sp. zo.o. in Radzyń Podlaski. The project provided for the preparation of preparatory documentation (energy audit and technical documentation), promotion of the project and thermomodernisation of the social and office building covering: insulation of external walls, replacement of window and door joinery, warming of ventilated floors and external ceiling, modernisation of central heating installations (replacement of radiators, assembly of thermostatic valves and thermal energy meter) together with hydraulic regulation of the installation, replacement of lighting fixtures for energy-saving. The main aim of the project is to reduce the consumption of heat and electricity, which will result in a reduction in emissions of pollutants into the air and a reduction in the operating costs of the building. The objectives of the project are in line with the objectives of Priority Axis 5, Measure 5.1 of the 2014-2020 ROP. The project will be implemented in 2020. The result of the project will be: — saving heat, saving electricity, reducing final energy consumption, reducing greenhouse gas emissions and PM10 emissions. The target group of the project is PEC Sp. z o.o. in Radzyń Podlaski (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.05.01.00-06-0071/19
    0 references