“Reconstruction and extension with change of use of UŁ buildings for the needs of the Senior House of the University of Lodz, located at ul. 1905 Revolution No. 66. 90-221 Łódź” (Q2702392)

From EU Knowledge Graph
Revision as of 20:15, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 1,950,483.13 euro)
Jump to navigation Jump to search
Project Q2702392 in Poland
Language Label Description Also known as
English
“Reconstruction and extension with change of use of UŁ buildings for the needs of the Senior House of the University of Lodz, located at ul. 1905 Revolution No. 66. 90-221 Łódź”
Project Q2702392 in Poland

    Statements

    0 references
    6,571,803.28 zloty
    0 references
    1,460,911.87 Euro
    0.2223 Euro
    0 references
    8,774,103.17 zloty
    0 references
    1,950,483.13 Euro
    0.2223 Euro
    0 references
    74.9 percent
    0 references
    15 July 2020
    0 references
    31 December 2021
    0 references
    UNIWERSYTET ŁÓDZKI
    0 references
    Q2521093 (Deleted Item)
    0 references

    51°46'7.3"N, 19°27'25.2"E
    0 references
    Łódź.Cel bezpośredni: Nadane nowe, społeczne funkcje zdegradowanej przestrzeni i infrastruktury technicznej poprzez utworzenie Domu Seniora Zadania: Opracowanie dokumentacji projektowej Opracowanie SW; Przebudowa i rozbudowa ze zmianą sposobu użytkowania budynków dydaktycznych („A” i „B”) oraz budynku dawnej portierni („C”) Uniwersytetu Łódzkiego przy ul. Rewolucji 1905r. nr 66 i renowacja oraz modernizacja ogrodzenia; Dostawa wyposażenia dla budynków A i B Domu Seniora UŁ ;Oferta społeczno-edukacyjna dla grup de faworyzowanych; Informacja i promocja Grupa docelowa: emerytowani pracownicy naukowi Uniwersytetu Łódzkiego, będący w trudnej sytuacji i samotni; zagrożeni ubóstwem; dzieci i młodzież z grup ze zdiagnozowanymi deficytami; osoby z grup nieuczestniczących dotychczas w życiu publicznym; osoby starsze z otoczenia i mieszkańcy Łodzi. Zapewniając pełną dostępność oferty na bazie utworzonej infrastruktury zakłada się jej otwarty i dostępny charakter dla osób starszych również z otoczenia i mieszkańców. Poza ofertą edukacyjną w okresie realizacji projektu, w pełni wykorzysta się utworzoną infrastrukturę w trakcie trwałości poprzez organizację różnych zajęć dla starszych osób z okolic. Efekty projektu: Powierzchnia obszarów objętych rewitalizacją - 0,327 ha.; Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach – 3 szt.; Budynki publiczne lub komercyjne wybudowane lub wyremontowane na obszarach miejskich – 1 694,5m2; Otwarta przestrzeń utworzona lub rekultywowana na obszarach miejskich - 506m2; Liczba zabytków nieruchomych objętych wsparciem – 3szt. ; Liczba przedsiębiorstw ulokowanych na zrewitalizowanych obszarach – 1 szt.; Liczba nowo utworzonych miejsc pracy kobiety / mężczyźni – 16; Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami – 3szt. (Polish)
    0 references
    Łódź. Direct objective: New social functions of degraded space and technical infrastructure through the creation of the Senior Tasks House: Preparation of design documentation Development of SW; Reconstruction and extension with changes in the use of teaching buildings (“A” and “B”) and the building of the former concierge room (“C”) of the University of Lodz at ul. 1905 Revolution No 66 and renovation and modernisation of the fence; Supply of equipment for buildings A and B of the Senior House UŁ;Socio-educational offer for deprivated groups; Information and promotion Target group: retired academic staff at the University of Lodz, who are in a difficult and lonely situation; at risk of poverty; children and adolescents with deficits diagnosed; persons from groups not yet involved in public life; elderly people from the surroundings and residents of Łódź. Ensuring that the offer is fully accessible on the basis of the infrastructure set up, it is assumed that it is open and accessible to older people also from their surroundings and residents. In addition to the educational offer during the period of the project, the created infrastructure will be fully utilised in the course of sustainability through the organisation of various activities for older people from the surrounding area. Project Effects: Area of revitalised areas – 0,327 ha; Number of infrastructure facilities supported in revitalised areas – 3; Public or commercial buildings built or renovated in urban areas – 1694,5 m²; Open space created or rehabilitated in urban areas – 506 m²; Number of fixed monuments supported – 3pcs. Number of enterprises located in revitalised areas – 1 item; Number of newly created female/men jobs – 16; Number of facilities adapted to the needs of persons with disabilities – 3 pcs. (English)
    7 July 2021
    0 references

    Identifiers

    RPLD.06.03.02-10-0009/17
    0 references