Renewable energy for Wojcieszków Municipality – stage 2 (Q2705810)

From EU Knowledge Graph
Revision as of 20:00, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: EU contribution (P835): 557,321.4 euro)
Jump to navigation Jump to search
Project Q2705810 in Poland
Language Label Description Also known as
English
Renewable energy for Wojcieszków Municipality – stage 2
Project Q2705810 in Poland

    Statements

    0 references
    2,507,068.82 zloty
    0 references
    557,321.4 Euro
    0.2223 Euro
    0 references
    2,949,492.74 zloty
    0 references
    655,672.24 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    30 August 2019
    0 references
    31 December 2022
    0 references
    GMINA WOJCIESZKÓW
    0 references

    51°46'9.8"N, 22°18'56.5"E
    0 references
    Przedmiotem projektu jest zakup i montaż Odnawialnych źródeł energii na budynkach mieszkalnych odbiorców indywidualnych/mieszkańców. Typy i moce: Moc zamontowanych instalacji wyniesie: instalacje solarne 240 szt o łacznej mocy 0,76 MW(165 instalacje o mocy 2,72 kw, 70 instalacji o mocy 4,08kw - montowane na dachu, 5 instalacji o mocy 5,44 kw - montowane na dachu); pompy ciepła14 szt. .o łacznej mocy. 0,028 MW(o mocy 2 kw kazda),.kotły na biomasę14 szt o łącznej mocy 0,29 MW( 7 szt. o mocy 16 kw i 7 szt. o mocy 25 kw), panele fotowoltaiczne 104..szt. o łącznej mocy. 0,42(52 instalacje o mocy 3,40 kw i 52 o mocy 4,76 kw - wszystkie montowane na dachach lub elewacji).Potrzebą jest zwiększenie udziału OZE w bilansie paliwowoenergetycznym na terenie gminy. Jakość powietrza w gminie jest dobra. Dla gminy nie ma obowiązku opracowania programu ochrony powietrza. W POP dla strefy lubelskiej (do której należy gmina Wojcieszków) nie wskazano działań naprawczych ani krótkoterminowych dla gminy, co oznacza że na jej terenie nie odnotowano przekroczenia poziomów substancji podlegających ocenie jakości powietrza. Problemem jest niska świadomość mieszkańców o ograniczonych zasobach nieodnawialnych surowców energetycznych i wykorzystaniu OZE. Zakres projektu: 1.montaż instalacji OZE (panele solarne, pompy ciepła i kotły na biomasę) w budynkach mieszkalnych ; 2.portal internetowy (serwis do transakcji on-line zapewniający szybkie kontakty z użytkownikami instalacji); 3.aplikacja na urządzenia mobilne(w celu edukacji energetycznej i ekologicznej mieszkańców oraz promocji OZE. Przedmiotowy projekt realizowany będzie poza obszarami ochrony konserwatorskiej.Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30) 1,50MW, Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE - 1 450, 85, Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE - 424, 32 (Polish)
    0 references
    The object of the project is the purchase and installation of Renewable Energy Sources on residential buildings of individual consumers/residents. Types and Powers: The power of the installed installations will be: solar installations 240 units with a total capacity of 0.76 MW(165 installations with a capacity of 2,72 kW, 70 installations with a capacity of 4.08kw – roof mounted, 5 installations with a capacity of 5.44 kw – mounted on the roof); heat pumps14 pcs. .with all the power. 0,028 MW(with a capacity of 2 kw each),.biomass boilers14 units with a total capacity of 0.29 MW(7 units with a capacity of 16 kW and 7 units with a capacity of 25 kw), photovoltaic panels of 104 units with a total capacity. 0.42(52 installations with a capacity of 3.40 kW and 52 with a capacity of 4.76 kw – all installed on roofs or facades).It is necessary to increase the share of RES in the fuel and energy balance in the municipality. The air quality in the municipality is good. There is no obligation for the municipality to draw up an air quality programme. The POP for the Lublin zone (to which the Municipality of Wojcieszków belongs) does not indicate any corrective or short-term actions for the municipality, which means that there were no exceedances of the levels of substances subject to air quality assessment. The problem is the low awareness of residents about the limited resources of non-renewable energy resources and the use of RES. Scope of the project: 1.installation of RES installations (solar panels, heat pumps and biomass boilers) in residential buildings; 2.Internet portal (online transaction service providing quick contacts with installation users); 3.Application for mobile devices (for energy and environmental education of residents and promotion of RES. The project will be implemented outside conservation protection areas.Additional capacity to generate energy from renewable sources (CI30) 1.50 MW, Production of thermal energy from newly built installations using RES – 1 450, 85, Production of electricity from newly built installations using RES – 424, 32 (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.04.01.00-06-0118/19
    0 references