Innovative mineral-asphalt mixtures produced by foamed asphalt technology by the addition of zeolite (Q2700273)

From EU Knowledge Graph
Revision as of 19:04, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: EU contribution (P835): 778,045.55 euro)
Jump to navigation Jump to search
Project Q2700273 in Poland
Language Label Description Also known as
English
Innovative mineral-asphalt mixtures produced by foamed asphalt technology by the addition of zeolite
Project Q2700273 in Poland

    Statements

    0 references
    3,499,980.0 zloty
    0 references
    778,045.55 Euro
    0.2223 Euro
    0 references
    6,363,600.0 zloty
    0 references
    1,414,628.28 Euro
    0.2223 Euro
    0 references
    55.0 percent
    0 references
    1 January 2020
    0 references
    31 December 2023
    0 references
    "ANDRO" ANNA MARIA FIJAŁKOWSKA
    0 references
    0 references

    51°48'2.5"N, 19°44'40.6"E
    0 references
    Celem projektu jest wdrożenie innowacyjnej technologii wytwarzania drogowych mieszanek mineralno-asfaltowych w technologii asfaltu spienionego przez dodatek zeolitów. Wykorzystane zostaną przy tym wyniki planowanych do zakupu wyników prac badawczo – rozwojowych. W skład zespołu ciągu technologicznego wchodzić będzie wytwórnia mas bitumicznych, węzeł betoniarski które zlokalizowane będą na nowo zakupionej nieruchomości niezabudowanej (koszt niekwalifikowalny) oraz oprogramowanie do kosztorysowania. W oparciu o planowane do zakupu wyniki prac B+R Wnioskodawca wprowadzi na rynek nowy produkt - mieszankę mineralno-asfaltową które w połączeniu z betonem na podbudowę dróg zapewniają odpowiednie parametry nawierzchni drogowej pod względem nośności, odporności na koleinowanie, trwałości. Głównym celem projektu jest zwiększenie konkurencyjności przedsiębiorstwa ANDRO Anna Maria Fijałkowska w skali krajowej, oparte na wdrożeniu innowacyjnej technologii wbudowania drogowych mieszanek mineralno – asfaltowych w technologii asfaltu spienionego przez dodatek zeolitów. Technologia ta wpisuje się swym zakresem w technologie produkcji mieszanek mineralno-asfaltowych na ciepło (ang. Warm Mix Asphalt), które w stosunku do rozwiązań tradycyjnych charakteryzują się obniżoną o około 20-30°C temperaturą produkcji. Projekt wpisuje się w Regionalne Inteligentne Specjalizacje (Zaawansowane Materiały Budowlane). Projekt będzie realizowany w okresie 1 stycznia 2020 r. – 31 grudnia 2023 r. w ramach trzech zadań: 1. Zakup linii produkcyjnych: wytwórni mas bitumicznych oraz węzła betoniarskiego 2. Zakup oprogramowania i infrastruktury IT 3. Zakup gotowych wyników prac B+R (Polish)
    0 references
    The aim of the project is to implement an innovative technology for the production of road mineral and asphalt mixtures in the technology of asphalt foamed by the addition of zeolite. In doing so, the results of the planned research and development work will be used. The technological sequence team will include a bituminous mass plant, a concrete junction that will be located on a newly purchased unbuilt property (ineligible cost) and costing software. Based on the results of the R & D works to be purchased, the Applicant will launch a new product – mineral-asphalt mix, which, in combination with concrete for road construction, provides adequate parameters of the road surface in terms of load capacity, resistance to rubbing, durability. The main goal of the project is to increase the competitiveness of ANDRO Anna Maria Fijałkowska on a national scale, based on the implementation of innovative technology for the incorporation of road mineral and asphalt mixtures in the technology of asphalt foamed by the addition of zeolite. This technology fits into the production of mineral-asphalt mixtures for heat. Warm Mix Asphalt), which, compared to traditional solutions, are characterised by a reduced production temperature by about 20-30 °C. The project is part of the Regional Smart Specialisations (Advanced Building Materials). The project will be implemented between 1 January 2020 and 31 December 2023 under three tasks: 1. Purchase of production lines: production of bituminous masses and concrete node 2. Purchase of software and IT infrastructure 3. Purchase of ready R & D results (English)
    7 July 2021
    0 references

    Identifiers

    RPLD.02.03.01-10-0103/19