Use of photovoltaic micro-installations for the Municipal and Residential Economy Enterprise in Stary Kurów (Q2699813)

From EU Knowledge Graph
Revision as of 18:11, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 13,169.05 euro)
Jump to navigation Jump to search
Project Q2699813 in Poland
Language Label Description Also known as
English
Use of photovoltaic micro-installations for the Municipal and Residential Economy Enterprise in Stary Kurów
Project Q2699813 in Poland

    Statements

    0 references
    29,450.0 zloty
    0 references
    6,546.73 Euro
    0.2223 Euro
    0 references
    59,240.0 zloty
    0 references
    13,169.05 Euro
    0.2223 Euro
    0 references
    49.71 percent
    0 references
    7 January 2019
    0 references
    31 January 2021
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ I MIESZKANIOWEJ W STARYM KUROWIE SP. Z O.O.
    0 references
    0 references

    52°51'25.9"N, 15°40'20.6"E
    0 references
    Przedmiotowy projekt polega na budowie mikroinstalacji OZE w postaci paneli fotowoltaicznych na stacji uzdatniania wody w Starym Kurowie. Panele zostaną umieszczone na gruncie w obrębie działki 301/2. Realizacja projektu wpisuje się w strategie rozwoju zarówno na szczeblu krajowym jak i lokalnym. Projekt odpowiada na bardzo ważną i istotną potrzebę poprawy jakości środowiska naturalnego, w tym przede wszystkim stanu powietrza. Podstawowymi celami projektu jest redukcja emisji gazów cieplarnianych do atmosfery oraz zwiększenie produkcji energii elektrycznej ze źródeł odnawialnych. Dzięki realizacji celu głównego osiągnięty zostanie cel szczegółowy, czyli zagospodarowanie lokalnych zasobów energii odnawialnej i rozpoczęcie produkcji energii ze słońca. Realizacja celu szczegółowego przekłada się na konkretne działania projektowe, czyli budowę instalacji fotowoltaicznej wraz z niezbędną infrastrukturą. Wykorzystanie energii wytworzonej w przedmiotowej instalacji na potrzeby Wnioskodawcy przyczyni się także do realizacji celu zrównoważonego rozwoju. Bezpośrednio korzyść z projektu odniesie projektodawca poprzez wygenerowanie oszczędności związanych ze zmniejszeniem zużycia energii elektrycznej. Ponadto efektem realizacji projektu, na którym skorzystają zarówno mieszkańcy gminy i regionu jak i przyjeżdżający tu turyści, będzie redukcja emisji zanieczyszczeń do atmosfery, co przełoży się na jakość powietrza oraz środowiska naturalnego i będzie wywierać pozytywny wpływ na zdrowie. W ramach projektu nie przewiduje się sprzedaży energii elektrycznej do sieci. Łączna moc planowanych do zainstalowania paneli fotowoltaicznych to 20 kW. W ramach projektu zaplanowano Wdrożenie w projekcie inteligentnych systemów zarządzania energią w oparciu o technologie TIK (Polish)
    0 references
    This project consists of the construction of a micro-installation of RES in the form of photovoltaic panels at a water treatment plant in Stary Kurów. The panels will be placed on the ground within plot 301/2. The implementation of the project is part of development strategies at both national and local level. The project responds to a very important and important need to improve the quality of the environment, including, above all, air status. The main objectives of the project are to reduce greenhouse gas emissions to the atmosphere and to increase the production of electricity from renewable sources. Meeting the headline target will achieve the specific objective of using local renewable energy resources and starting to produce energy from the sun. The implementation of the specific objective translates into concrete design activities, i.e. the construction of a photovoltaic installation with the necessary infrastructure. The use of energy generated by the installation in question for the purposes of the Applicant will also contribute to the achievement of the sustainable development objective. The project will directly benefit from the project by generating savings related to the reduction of electricity consumption. In addition, the project, which will benefit both the inhabitants of the municipality and the region and the tourists coming here, will reduce emissions of pollutants into the atmosphere, which will translate into air quality and the environment and will have a positive impact on health. The project does not foresee the sale of electricity to the grid. The total capacity planned to install photovoltaic panels is 20 kW. The project has planned the implementation of intelligent energy management systems based on ICT technologies in the project (English)
    7 July 2021
    0 references

    Identifiers

    RPLB.03.01.00-08-0088/19
    0 references