Modernisation works on the Border Oder to ensure winter icebreaking – sections 1, 2 and 4 (Q2693021)

From EU Knowledge Graph
Revision as of 13:33, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: EU contribution (P835): 47,046,331.75 euro)
Jump to navigation Jump to search
Project Q2693021 in Poland
Language Label Description Also known as
English
Modernisation works on the Border Oder to ensure winter icebreaking – sections 1, 2 and 4
Project Q2693021 in Poland

    Statements

    0 references
    211,634,420.83 zloty
    0 references
    47,046,331.75 Euro
    0.2223 Euro
    0 references
    248,981,671.56 zloty
    0 references
    55,348,625.59 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 January 2019
    0 references
    31 December 2023
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    52°21'20.5"N, 14°33'58.3"E
    0 references

    53°32'42.4"N, 15°33'58.3"E
    0 references
    W ramach ww. Projektu przewiduje się wykonanie prac modernizacyjnych na Odrze, na odcinkach o łącznej długości 14,2 km, z czego 5,7 km zlokalizowanych jest w województwie lubuskim, a 8,5 km w województwie zachodniopomorskim. Celem realizacji Projektu jest poprawa warunków nawigacyjnych na Odrze granicznej na odcinkach 1,2 i 4 i dostosowanie ich do III klasy drogi wodnej. Realizacja odcinka 1, 2 i 4 w ramach Projektu obejmuje odbudowę zabudowy regulacyjnej Odry granicznej na w/w odcinkach. Łącznie zmodernizowanych zostanie 113 ostróg regulacyjnych, wybudowane zostaną 3 ostrogi, Projekt obejmuje również swoim zakresem 1 tamę podłużną i 1 opaskę brzegową. Modernizacja (rozbudowa) zabudowy regulacyjnej oparta będzie przede wszystkim na rozbudowie istniejących budowli regulacyjnych (113 ostróg) oraz budowie niewielkiej ilości nowych obiektów w postaci 3 ostróg, jednej tamy podłużnej i jednej opaski brzegowej. Projekt dotyczy w szczególności odbudowy najbardziej zniszczonych ostróg. (Polish)
    0 references
    Within the framework of the above-mentioned The project provides for modernisation works in the Oder region, on sections with a total length of 14.2 km, of which 5.7 km are located in Lubuskie Voivodeship and 8.5 km in Zachodniopomorskie voivodship. The aim of the project is to improve navigation conditions on the Border Oder on sections 1,2 and 4 and to adapt them to class III of the waterway. The implementation of sections 1, 2 and 4 of the Project involves the reconstruction of the regulatory building of the Border Odra on the above-mentioned sections. In total 113 regulatory sharps will be modernised, 3 spurs will be built, the project also covers 1 longitudinal dam and 1 coastband. The modernisation (extension) of the regulatory building will be based primarily on the expansion of existing regulatory structures (113 plumbers) and the construction of a small number of new objects in the form of 3 spurs, one longitudinal dam and one coastband. The project concerns, in particular, the reconstruction of the most damaged spurs. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.03.02.00-00-0086/20
    0 references