Construction of a high-efficiency gas cogeneration system with a capacity of up to 1 MW for PASOMIX Sp. z o.o. in Biskupic Ołoboczny. (Q2692803)

From EU Knowledge Graph
Revision as of 13:13, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 901,954.68 euro)
Jump to navigation Jump to search
Project Q2692803 in Poland
Language Label Description Also known as
English
Construction of a high-efficiency gas cogeneration system with a capacity of up to 1 MW for PASOMIX Sp. z o.o. in Biskupic Ołoboczny.
Project Q2692803 in Poland

    Statements

    0 references
    0 references
    1,816,425.0 zloty
    0 references
    403,791.28 Euro
    0.2223 Euro
    0 references
    4,057,376.0 zloty
    0 references
    901,954.68 Euro
    0.2223 Euro
    0 references
    44.77 percent
    0 references
    1 June 2019
    0 references
    31 December 2021
    0 references
    TASOMIX SP. Z O.O.
    0 references
    0 references

    51°42'39.2"N, 17°59'39.5"E
    0 references
    Przedmiotowe przedsięwzięcie polegać będzie na instalacji układu kogeneracyjnego o mocy elektrycznej 1,0 MW, rozbudowany o moduł odzysku ciepła i realizowane będzie na działce o numerze nr 836/7, jedn. ew. Gmina Nowe Skalmierzyce, obręb: Biskupice Ołoboczne. Planowany projekt zainstalowania zespołu kogeneracyjnego zakłada: - moduł kogeneracyjny, pracujący z mocą maksymalną z możliwością ręcznej i automatycznej zmiany mocy generatora w zakresie od 35% do 100% mocy znamionowej, - wytwarzanie energii elektrycznej zużywana będzie w całości na potrzeby własne Wnioskodawcy, - podobnie będzie z energią cieplną pochodząca z chłodzenia silnika i spalin. Energia pochodząca z układu wydalania spalin, będzie dodatkowo wykorzystywana do zasilania wytwornicy pary technologicznej i będzie mieć moc nominalna ok. 440 kW i sprawność ok. 18,7 %. Równolegle, nominalna moc cieplna źródła, jakie stanowi płaszcz silnika (jego zamknięty układ chłodzenia) wynosić będzie 556 kW, a jego sprawność 23,53%. Ciepło to będzie wykorzystywane do wstępnego podgrzewania wody kierowanej następnie do wytwornicy oraz na potrzeby CO i CWU. Łączna moc cieplna układu wyniesie 997 kW, a jego sprawność 41,19%. (Polish)
    0 references
    The project will consist of the installation of a cogeneration system with an electrical capacity of 1,0 MW, expanded by a heat recovery module and will be carried out on the plot No 836/7, one e.g. Municipality of Nowe Skalmierzce, area: Bishopric of Olobbyne. The planned project for installing a cogeneration unit assumes: — a cogeneration module operating at maximum power with the possibility of manually and automatically changing the power of the generator in the range of 35 % to 100 % of the rated power, – the generation of electricity will be consumed entirely for the Applicant’s own needs, – the same will be the heat from the cooling of the engine and the exhaust gases. The energy from the exhaust gas removal system will be additionally used to supply the process steam generator and will have a nominal power of approx. 440 kW and efficiency approx. 18.7 %. In parallel, the nominal heat output of the engine shell (its closed cooling system) will be 556 kW and its efficiency 23,53 %. This heat will be used for the preheating of water then fed to the generator and for the purposes of CO and CWU. The total thermal output of the system will be 997 kW and its efficiency will be 41.19 %. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.01.06.01-00-0093/19
    0 references