Innovation in the food industry (Q2687905)

From EU Knowledge Graph
Revision as of 11:41, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 1,417,607.1 euro)
Jump to navigation Jump to search
Project Q2687905 in Poland
Language Label Description Also known as
English
Innovation in the food industry
Project Q2687905 in Poland

    Statements

    0 references
    2,869,650.0 zloty
    0 references
    637,923.19 Euro
    0.2223 Euro
    0 references
    6,377,000.0 zloty
    0 references
    1,417,607.1 Euro
    0.2223 Euro
    0 references
    45.0 percent
    0 references
    15 January 2021
    0 references
    31 October 2022
    0 references
    JES OPAKOWANIA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA
    0 references
    0 references

    54°12'26.3"N, 16°13'3.0"E
    0 references
    SA 42799(2015/X) Projekt dotyczy wdrożenia do produkcji nowej generacji opakowania, które jest przystosowane do wykorzystania w procesach sterylizacji i pasteryzacji, tzn. procesy pasteryzacji i sterylizacji mogą być wykonywane dla żywności już zapakowanej w te opakowania. Nowe parametry opakowania zostały osiągnięte dzięki przeprowadzonym badaniom nad kształtem opakowania, które będzie w stanie skompensować gwałtowne wzrosty ciśnienia wewnątrz opakowania. Wzrost ciśnienia wewnątrz opakowania występuje na skutek powstających par i gazów, związanych z działaniem wysokiej temperatury. Zmiany te dotyczą konstrukcji pojemnika jak i pokrywki. Zmiany w wyrobie są odzwierciedlone w konstrukcji formy wtryskowej. Aby skrócić proces wdrażania na rynek opakowań nowej generacji wg unikatowych wzorów klientów (opakowania dedykowane) planowana jest inwestycja we własną narzędziownię. Bazą do projektu są nabyte wyniki prac B+R (udzielona licencja), których wykonawcą była Katedra Automatyki, Mechaniki i Konstrukcji Wydziału Mechanicznego Politechniki Koszalińskiej. Wyniki były efektem projektu dotowane z programu 2.3.2 Bony na innowacje dla MŚP. W ramach projektu, powstanie opakowanie cienkościenne, jednorazowe, wytwarzane metodą wtryskową, wykonane z polipropylenu, składające się z pokrywki i pojemnika. Opakowanie można zdobić etykietą IML, zapewniając trwałość zdobienia podczas różnorodnych procesów termicznych. Projekt jest przewidziany do wdrożenia w 3 etapach: Etap 1: Modernizacja hali na potrzeby narzędziowni Etap 2: Zakup wyposażania narzędziowni Etap 3: Zakup wtryskarki i uruchomienie produkcji Projekt jest gotowy do realizacji. Projekt dotyczy innowacji produktowej. Okres realizacji: 05.2021 do 10.2022 (Polish)
    0 references
    SA 42799(2015/X) The project concerns the implementation of a new generation of packaging, which is adapted for use in sterilisation and pasteurisation processes, i.e. pasteurisation and sterilisation processes can be performed for food already packed in these packages. New packaging parameters have been achieved by research into the shape of the packaging, which will be able to compensate for sharp increases in pressure inside the packaging. An increase in the pressure inside the packaging occurs as a result of the formation of vapours and gases associated with the action of high temperatures. These changes concern the design of the container as well as the lid. Changes in the product are reflected in the design of the injection mold. In order to shorten the process of deploying new generation packaging to the market according to unique customer designs (dedicated packaging), it is planned to invest in its own tool shop. The basis for the project is the acquired results of R & D works (licence granted), the contractor of which was the Department of Automation, Mechanics and Construction of the Faculty of Mechanical Engineering of Koszalin University of Technology. The results were the result of the project subsidised by the programme 2.3.2 Innovation vouchers for SMEs. As part of the project, a thin-wall packaging, disposable, injection-made, made of polypropylene, consisting of a lid and a container will be created. The packaging can be decorated with an IML label, ensuring durability of decorating during a variety of thermal processes. The project is planned to be implemented in 3 phases: Step 1: Modernisation of the hall for tool room Stage 2: Purchase of tool shop equipment Stage 3: Purchase of injection moulding machine and commissioning of production The project is ready for implementation. The project concerns product innovation. Implementation period: 05.2021 to 10.2022 (English)
    7 July 2021
    0 references

    Identifiers

    POIR.03.02.01-32-0002/20
    0 references