Project Phase Integrated Waste Management System in Iași County (Q3095669)

From EU Knowledge Graph
Revision as of 09:54, 17 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3095669 in Romania
Language Label Description Also known as
English
Project Phase Integrated Waste Management System in Iași County
Project Q3095669 in Romania

    Statements

    0 references
    0 references
    0 references
    23,992,281.16 Romanian Leu
    0 references
    4,798,456.232 Euro
    13 September 2021
    0 references
    28,226,213.12 Romanian Leu
    0 references
    5,645,242.624000001 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    14 February 2014
    0 references
    30 June 2020
    0 references
    JUDEŢUL IAŞI
    0 references
    0 references

    46°56'5.42"N, 23°16'15.78"E
    0 references

    46°41'56.80"N, 27°54'0.72"E
    0 references

    47°8'2.80"N, 27°47'38.11"E
    0 references
    Proiectul “Fazarea proiectului Sistem de Management Integrat al Deșeurilor în județul Iași” este implementat la nivelul județului Iași, parte a Regiunii de Dezvoltare Nord-Est a României, cu o populație totală de 832.385 locuitori (2010). Toate investițiile prevăzute în cadrul acestui proiect au ca obiectiv completarea infrastructurii deja existente în județul Iași, care împreună să asigure un sistem de management integrat al deșeurilor, astfel că vor fi asigurate standardele minime în vederea conformării cu cerințele UE în domeniul protecției mediului și cu țintele pe care România și le-a asumat prin Tratatul de aderare. Prin prezentul proiect, reprezentând faza 2 a investițiilor initiate prin POS Mediu 2007-2013, se asigură respectarea indicatorilor fizici stabiliți la nivelul aplicației de finanțare și contribuie la îndeplinirea indicatorilor POIM prin finalizarea investițiilor și operaționalizarea următoarelor instalații: - Stația de TMB Țuțora - Stațiile de sortare Țuțora și Ruginoasa - Stațiile de transfer Bălțați și Ruginoasa - Închidere depozit urban neconform Hârlau Totodată, investiţiile continuate vor avea ca rezultat: - depozitarea conforma a deseurilor si închiderea depozitelor neconforme, în conformitate cu prevederile directivelor europene şi cu angajamentele asumate prin Tratatul de Aderare va contribui la reducerea impactului negativ asupra mediului, - extinderea colectării selective, astfel incat sa se asigure indeplinirea obiectivelor legate de creşterea ponderii deşeurilor reciclate/valorificate în totalul cantităţii de deşeuri colectate. Masura va avea ca rezultat si reducerea cantitatii de deseuri depozitate si, astfel, cresterea duratei de viata a depozitului de deseuri; - optimizarea sistemului de management al deseurilor prin reducerea impactului aferent transportului deseurilor la facilitatile de tratare/depozitare. (Romanian)
    0 references
    The project “The Phase of the Integrated Waste Management System Project in Iasi County” is implemented at the level of Iasi County, part of the North-East Development Region of Romania, with a total population of 832,385 inhabitants (2010). All the investments foreseen under this project aim to complement the infrastructure already in place in Iași County, which together ensures an integrated waste management system, so that minimum standards will be ensured in order to comply with EU requirements in the field of environmental protection and with the targets Romania has assumed under the Accession Treaty. The present project, representing phase 2 of investments initiated by SOP ENV 2007-2013, ensures compliance with the physical indicators established at the level of the financing application and contributes to the fulfilment of LIOP indicators by completing investments and operationalising the following facilities: — TMB station Ţuţora – sorting stations Ţuţora and Ruginoasa – Transfer Stations Balţati and Ruginoasa – Closure of urban warehouse not in compliance with Hârlau At the same time, continued investments will result in: — compliant landfilling and the closure of non-compliant landfills, in accordance with the provisions of the European directives and the commitments made in the Accession Treaty, will contribute to reducing the negative impact on the environment, – expanding selective collection so as to ensure that the targets for increasing the share of recycled/recovered waste in the total amount of waste collected are met. The measure will also result in the reduction of the amount of waste stored and thus increasing the life of the landfill; — optimising the waste management system by reducing the impact of waste transport to treatment/storage facilities. (English)
    16 September 2021
    0 references
    Bălţaţi, Romania
    0 references
    Ţuţora, Romania
    0 references
    Ruginoasa, Romania
    0 references
    Oraş Hârlau, Romania
    0 references

    Identifiers

    107857
    0 references