Reduction of energy intensity in production halls 1-16 at SAM – SHIPBUILDING AND MACHINERY a.s. (Q3106214)

From EU Knowledge Graph
Revision as of 15:48, 15 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3106214 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity in production halls 1-16 at SAM – SHIPBUILDING AND MACHINERY a.s.
Project Q3106214 in Slovakia

    Statements

    0 references
    439,452.65 Euro
    0 references
    1,289,264.27 Euro
    0 references
    0.45 percent
    0 references
    4 January 2021
    0 references
    3 January 2022
    0 references
    SAM - SHIPBUILDING AND MACHINERY a. s.
    0 references

    48°8'54.96"N, 17°6'27.90"E
    0 references
    Predmetom projektu je zníženie energetickej náročnosti výrobných hál č. 1-16 v areály bývalých Komárňanských lodeníc, nachádzajúcich sa v meste Komárno. Výrobné haly sú v majetku spoločnosti SAM-SHIPBUILDING AND MACHINERY a.s. sú zapísané na liste vlastníctva ako priemyselné budovy. V halách prebieha výroba zvárané a oceľové komponenty pre stavebné a cestné stroje – podvozkové rámy, výložníky, traverzy, pylóny a výrobu strojárskych komponentov pre rezacie stoly na ekologické spracovanie odpadu. Zároveň sa tu vykonáva výstavba a oprava lodí, t.j. slúžia aj ako suchý dok. Uvedené haly boli postavené v roku 1898. Projekt s zameriava na zlezenie svetelných podmienok v uvedených halách, ktoré povedú k zníženiu energetickej náročnosti. V tomto smere budú realizované dve aktivity: 1) výmena strešných svetlíkov a 1) rekonštrukcia osvetlenia. Prvá aktivita prinesie zmenu svetelných podmienok a zvýšenie využívania denného osvetlenia. Staré svetlíky z nízkou priehľadnosťou z drátkového skla budú vymenené za polykarbonátové so zvýšenou odolnosťou voči poveternostným vplyvom. Druhá aktivita prinesie demontáž starých svietidiel s ortuťovými výbojkami a ich náhradu za LED svietidlá so smart ovládaním. Vďaka tomu sa zníži nielen potrebný počet svietidiel, ale aj celková spotreba primárnych energetických zdrojov. Kým doteraz sa vždy musela rozsvietiť celá hala, aj keď bola využívaná len jej časť, po novom sa bude dať modulovať, koľko lámp sa zasvieti v závislosti od potreby. Tieto opatrenia prispejú k zníženiu energetickej náročnosti prevádzky priemyselných objektov. Naplnia sa tým ciele projektu: Znížiť energetickú náročnosť prevádzky znížením množstva spotrebovávaných primárnych energetických zdrojov. T.j. projekt prispeje k úsporám elektrickej energie ako primárneho energetického zdroja. Iné energetické zdroje nebudú realizáciou projektu zasiahnuté. (Slovak)
    0 references
    The object of the project is to reduce the energy intensity of production halls No. 1-16 in the area of former Komárno shipyards located in the town of Komárno. Production halls are owned by SAM-SHIPBUILDING AND MACHINERY a.s. are registered on the title deed as industrial buildings. The halls are producing welded and steel components for construction and road machinery – chassis frames, booms, transverses, pylons and the production of mechanical components for cutting tables for environmentally friendly waste treatment. At the same time, the construction and repair of ships is carried out, i.e. they also serve as a dry dock. These halls were built in 1898. The project aims at climbing the lighting conditions in the above-mentioned halls, which will lead to a reduction in energy intensity. Two activities will be carried out in this regard: 1) Rooflight replacement and 1) lighting renovation. The first activity will bring about a change in lighting conditions and an increase in the use of daylight. Old lights with low transparency made of door glass will be replaced with polycarbonate with increased weather resistance. The second activity will bring the dismantling of old mercury discharge lamps and their replacement for LED lights with smart control. This will reduce not only the necessary number of luminaires, but also the total consumption of primary energy sources. While the whole hall has always had to light up until now, even if only part of it has been used, it will be possible to modulate how many lamps light up depending on the need. These measures will contribute to reducing the energy intensity of the operation of industrial buildings. This will meet the objectives of the project: Reduce the energy intensity of the operation by reducing the amount of primary energy sources consumed. I.e. the project will contribute to saving electricity as a primary energy source. Other energy sources will not be affected by the implementation of the project. (English)
    15 September 2021
    0 references

    Identifiers

    310041V424
    0 references