Reconstruction of the maternal cola on ul. Vajansky in Roňava (Q3100914)

From EU Knowledge Graph
Revision as of 15:25, 15 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3100914 in Slovakia
Language Label Description Also known as
English
Reconstruction of the maternal cola on ul. Vajansky in Roňava
Project Q3100914 in Slovakia

    Statements

    0 references
    400,388.29 Euro
    0 references
    471,045.05 Euro
    0 references
    0.85 percent
    0 references
    1 January 2018
    0 references
    1 October 2021
    0 references
    Mesto Rožňava
    0 references

    48°39'18.29"N, 20°32'22.60"E
    0 references
    Areál Materskej školy na ulici Vajanského, vybudovanej v rokoch 1971-1974, pozostáva z 3 objektov – dva pavilóny MŠ (pavilón A, pavilón B) + hospodársky pavilón. POVODNÝ STAV: Pavilón A, dvojpodlažný, boli v ňom umiestnené 4 triedy MŠ (dve na prízemí a dve na prvom podlaží). Pavilón B, dvojpodlažný, slúžil ako spoločenská miestnos pre všetky triedy MŠ a časom aj ako detské jasle či CVČ. V roku 2012 bolo mesto Rožňava, z dôvodu havarijného stavu pavilónu A (statické poruchy panelových stavieb), nútené vykona stavebné úpravy na pavilóne B a vytvori v ňom triedy. Kapacitne to však nepostačovalo na umiestnenie všetkých detí z pavilónu A. Čas detí bola teda umiestnená do iných predškolských zariadení mesta Rožňava. SÚČASNÝ STAV: MŠ navštevuje 60 detí, ktoré sú umiestnené v 3 triedach pavilónu B. Pavilón A je nevyužívaný.CIEź PROJEKTU: Rekonštrukciou  MŠ Vajanského vytvori príažlivé prostredie, ktoré bude schopné udržatežne poskytova kvalitné služby v oblasti predškolského vzdelávania. Zrekonštruova pavilón A, vytvori v ňom 2 nové triedy MŠ ako aj spoločenskú miestnos pre všetky deti zariadenia. Po rekonštrukcii bude MŠ pozostáva z 5 fungujúcich tried (3 pôvodné a 2 novovytvorené).V roku 2016 mesto Rožňava z vlastných zdrojov odstránilo havarijný stavu dvojpodlažného pavilónu. Avšak vzhžadom na skutočnos, že od uvedenia budovy do prevádzky v 70. rokoch, nebola na budove uskutočnená žiadna rekonštrukcia, je v súčasnosti okrem dispozičných úprav potrebné budovy MŠ  prispôsobi súčasným energetickým technickým normám, čím sa zabezpečí aj energetická efektívnos zariadenia.Projekt zahŕňa nasledovné aktivity:Pavilón A – rekonštrukcia interiéru, kúrenia a elektrických rozvodov, zmena dispozície, výmena okien a vchodových dverí, zateplenie obvodových stien, zastrešenie objektu.Areál MŠ – rekonštrukcia spevnených a nespevnených plôch areálu, osadenie detského mobiliáru. (Slovak)
    0 references
    The area of Materská Kola on the street Vajanský, built in years 1971-1974, consists of 3 buildings two pavilions M (pavilion A, pavilion B) + economic pavilion. FLOODING: Pavilion A, two-storey, was located in it 4 M-class (two on the ground floor and two on the first floor). Pavilion B, two-storey, served as a social room for all M class and over time as a nursery or CVČ. In 2012, the town of Roňava, due to the emergency condition of pavilion A (static breakdowns of panel structures), was forced to carry out construction works on pavilion B and create classes in it. The capacity was not sufficient to accommodate all children from Pavilion A. Therefore, children’s time was placed in other pre-school facilities of the town of Roňava. STATE OF PLAY: M visits 60 children who are located in 3 classes of pavilion B. Pavilion A is unusable. The reconstruction of M Vajanský will create a friendly environment that will be able to provide quality services in the field of pre-school education. Zrekontru’s pavilion A, it will create 2 new M-classes as well as a social room for all children’s facilities. After reconstruction, M will consist of 5 functioning classes (3 original and 2 newly created).In 2016, the town of Roňava removed the emergency state of the two-floor pavilion from its own resources. Avak due to the fact that since the start of operation of the building in the 1970s, the building has not been reconstructed, it is currently necessary to adapt the M building to current energy technical standards, which will ensure the energy efficiency of the equipment.The project includes the following aktivity:Pavilón and recontrusion of interior, heating and electrical wiring, change of layout, replacement of windows and entrance doors, insulation of perimeter walls, roofing of the building.Areál M recontrusion of the paved and unpaved areas of the area, installation of children’s mobile phone. (English)
    15 September 2021
    0 references

    Identifiers

    302021H887
    0 references