Cycling route Ferčekovce – Novoveská Huta (Q3105983)

From EU Knowledge Graph
Revision as of 15:09, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3105983 in Slovakia
Language Label Description Also known as
English
Cycling route Ferčekovce – Novoveská Huta
Project Q3105983 in Slovakia

    Statements

    0 references
    628,646.59 Euro
    0 references
    739,584.22 Euro
    0 references
    0.85 percent
    0 references
    6 January 2020
    0 references
    5 January 2022
    0 references
    Mesto Spišská Nová Ves
    0 references

    48°56'36.71"N, 20°34'4.73"E
    0 references
    Projekt je zameraný na obmedzenie motorovej dopravy a jej nahradenie alternatívnou cyklistickou dopravou, ktorá bude vedená samostatne a v príjemnom prostredí, mimo ostatných účastníkov dopravy.Územie budúcej stavby sa nachádza na parcelách C-KN č. 8099/1 (E-KN č. 55972, 57681/1a, 57681/502), 9797/1, 8098/1 (E-KN č. 7800), 9714,9716/1, 9717/1, 9712/1, 9797/7 vo vlastníctve žiadateľa.  V súčasnosti toto územie tvoria trávnaté plochy (lúka), resp. vyjazdená lesná cesta bez iného využitia. Hlavným cieľom projektu je prepojenie mestských častí Ferčekovce a Novoveskej Huty (počet obyvateľov 2101) formou dopravy prospešnou pre zdravie človeka a nezaťažujúcou životné prostredie. Navrhovaná cyklotrasa je obojsmerná, dvojpruhová so spevneným povrchom šírky 3,50 m a celkovej dĺžky 1 927,67 m. Na trase bude realizované aj cyklistické odpočívadlo nachádzajúce sa 0,3 km od mestskej časti Ferčekovce s jednoduchým dreveným prístreškom pre možnosť krátkeho oddychu cyklistov. Špecifické ciele projektu:1.     Prepojenie centier hospodárskeho významu a ponuka alternatívnej nemotorovej dopravy pre obyvateľov a návštevníkov mesta.2.     Zatraktívnenie novo vybudovanej cyklistickej komunikácie za účelom zvýšenia podielu nemotorovej dopravy na celkovom počte prepravovaných osôb.3.     Zníženie znečistenia ovzdušia motorovou dopravou prostredníctvom nárastu počtu obyvateľov využívajúcich cyklistickú komunikáciu.4.     Podpora naplnenia merateľných ukazovateľov Integrovaného regionálneho operačného programu 2014 –  2020 prostredníctvom úspešnej realizácie predkladaného projektu. Hlavné aktivity projektu:1. SO 01A: Výstavba cyklochodníka2. SO 01B:Výstavba prístrešku pre cyklistov Cieľová skupina: široká verejnosť, najmä obyvatelia mesta a návštevníci mesta Spišská Nová Ves Realizácia projektu bude uskutočnená počas 12 mesiacov, v období 03/2020 - 02/2021 Miesto realizácie projektu: Košický samosprávny kraj, okres a mesto Spišská Nová Ves (Slovak)
    0 references
    The project is aimed at limiting motor transport and replacing it with alternative cycling transport, which will be conducted separately and in a pleasant environment, outside other transport participants.The territory of the future construction is located on plots C-KN No. 8099/1 (E-KN No. 55972, 57681/1a, 57681/502), 9797/1, 8098/1 (E-KN No. 7800), 9714,9716/1, 9717/1, 9712/1, 9797/1, 9797/7 owned by the applicant.  At present, this area consists of grassland (meadow) or used forest road without any other use. The main objective of the project is to connect the districts of Ferčekovce and Novoveská Huta (population of 2101) in a form of transport beneficial for human health and without burdening the environment. The proposed cycle path is two-way, two-lane with a paved surface of 3.50 m wide and a total length of 1927.67 m. On the route will also be realised cycling rest located 0.3 km from the city district Ferčekovce with a simple wooden shelter for short relaxation of cyclists. Specific objectives of the project:1.     Connecting centres of economic importance and offering alternative non-motorised transport for residents and visitors of the city.2.     Making the newly built cycle communication more attractive in order to increase the share of non-motorised transport in the total number of persons transported.3.     Reducing air pollution by motor transport through an increase in the number of people using cycling communications.4.     Support the achievement of measurable indicators of the Integrated Regional Operational Programme 2014-2020 through the successful implementation of the present project. Main activities of the project:1. SO 01A: Construction of the cycle path2. So 01B: Construction of a shelter for cyclists Target group: general public, especially city residents and visitors to Spišská Nová Ves The implementation of the project will be carried out during the 12 months, in the period 03/2020-02/2021 Place of implementation of the project: Košice self-governing region, district and town Spišská Nová Ves (English)
    15 September 2021
    0 references

    Identifiers

    302011X051
    0 references