Energy Efficiency at Hospital de Abrantes (Q2981185)

From EU Knowledge Graph
Revision as of 14:49, 15 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2981185 in Portugal
Language Label Description Also known as
English
Energy Efficiency at Hospital de Abrantes
Project Q2981185 in Portugal

    Statements

    0 references
    985,064.61 Euro
    0 references
    1 January 2017
    0 references
    30 April 2021
    0 references
    CENTRO HOSPITALAR DO MÉDIO TEJO EPE
    0 references
    0 references
    0 references

    39°30'21.53"N, 8°12'48.49"W
    0 references
    O Hospital de Abrantes propõe-se reconverter os seus sistemas energéticos, de forma a obter poupanças significativas, mantendo e melhorando os outputs de serviço e de segurança no abastecimento. Esta operação incidir sobre os drivers de consumo energético, nomeadamente: Introdução de LED, produção de energia através de painéis fotovoltaico, melhoria no sistema de produção de água quente e novos envidraçados (Portuguese)
    0 references
    The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English)
    9 July 2021
    0 references
    Abrantes, União das freguesias de Abrantes (São Vicente e São João) e Alferrarede
    0 references

    Identifiers

    POSEUR-01-1203-FC-000065
    0 references