Rehabilitation of the wastewater treatment plant of the Sobrados system – Municipal Road (Q2982715)

From EU Knowledge Graph
Revision as of 14:43, 15 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2982715 in Portugal
Language Label Description Also known as
English
Rehabilitation of the wastewater treatment plant of the Sobrados system – Municipal Road
Project Q2982715 in Portugal

    Statements

    0 references
    48,485.8 Euro
    0 references
    1 June 2019
    0 references
    31 May 2021
    0 references
    ÁGUAS DO INTERIOR - NORTE, E.I.M., S.A.
    0 references
    Q3054884 (Deleted Item)
    0 references
    0 references

    41°15'48.17"N, 7°35'32.17"W
    0 references
    Com a presente candidatura pretende-se reduzir a poluição das linhas de água e lençóis freáticos por via da instalação de uma etapa complementar de tratamento, por forma a cumprir as normas de descarga no meio ambiente da legislação atual, bem como contribuir para o cumprimento da DARU por via da redução da poluição urbana das massas de água na área de influência da Bacia do Douro. (Portuguese)
    0 references
    With this application, the aim is to reduce the pollution of water lines and groundwater by installing a complementary stage of treatment, in order to comply with the standards of discharge into the environment of the current legislation, as well as to contribute to the compliance with Daru by reducing urban pollution of water bodies in the area of influence of the Douro region. (English)
    9 July 2021
    0 references
    Sabrosa, Paços
    0 references

    Identifiers

    POSEUR-03-2012-FC-001120
    0 references