D1 For ov, west For ov, south (Q3102572)

From EU Knowledge Graph
Revision as of 13:54, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3102572 in Slovakia
Language Label Description Also known as
English
D1 For ov, west For ov, south
Project Q3102572 in Slovakia

    Statements

    0 references
    278,317,478.82 Euro
    0 references
    327,432,328.02 Euro
    0 references
    0.85 percent
    0 references
    1 June 2017
    0 references
    1 December 2022
    0 references
    Národná diažničná spoločnos, a.s.
    0 references
    0 references

    48°9'32.98"N, 17°3'6.62"E
    0 references
    1. Ciežom projektu je dobudovanie základného diažničného ahu D1, skvalitni podmienky pre medzinárodnú a vnútroštátnu dopravu a zvýši plynulos, kapacitu, rýchlos a zároveň bezpečnos cestnej premávky. Po ukončení výstavby predmetného úseku D1 v dĺžke 7,87 km sa vytvoria podmienky k podstatnému odžahčeniu dopravy na ceste I/68 a ceste I/18 (odklon tranzitnej nákladnej aj osobnej dopravy z intravilánu mesta Prešov).2. Aktivity projektu sú zamerané na výstavbu diažnic a rýchlostných ciest vrátane privádzačov (TEN-T CORE) s ciežom odstránenia kžúčových úzkych miest na cestnej infraštruktúre TEN-T prostredníctvom výstavby nových úsekov diažnic a rýchlostných ciest.3. Miesto realizácie projektu je v Prešovskom kraji, v okrese Prešov. Diažnica D1 je súčasou TEN-T Core siete, pričom plní významnú vnútroštátnu ako aj medzinárodnú dopravnú funkciu.4. Meratežnými ukazovatežmi predmetného projektu sú:Celková dĺžka novovybudovaných ciest v sieti TEN-T (CORE) – 7 870 m.Úspora času v cestnej doprave na diažniciach a rýchlostných cestách – 34 515 715  eur.Úspora produkcie emisií NO2 (vplyvom výstavby diažnic) – 10 ton.Úspora produkcie emisií PM10 (vplyvom výstavby diažnic) – 2,4 ton.5. Základné údaje o stavbe:Dĺžka komunikácie:                          7 870 mKategória komunikácie:                   D 26,5/100Návrhová rýchlos:                           100 km/hodDĺžka tunela:                                      2 244 mKategória tunela:                              2 x T 7,5Počet križovatiek:                             2 – mimoúrovňová križovatka Prešov západ, mimoúrovňová križovatka Prešov JuhPočet mostných objektov:              18Celkový počet vetiev križovatiek:    17Súčasou stavby je stredisko správy a údržby diažnice – SSÚD Prešov (Slovak)
    0 references
    1. The aim of the project is to complete the basic D1 diažnice ahu, improve conditions for international and national traffic and increase the flow, capacity, speed and at the same time road safety. After the completion of the construction of the D1 section in question in the 7.87 km line, conditions will be created for the substantial relaxation of traffic on road I/68 and road I/18 (departure of transit freight and passenger traffic from Preov intravalve).2. The activities of the project are focused on the construction of distances and expressways, including feeders (TEN-T CORE), with the aim of eliminating key bottlenecks on the TEN-T road infrastructure through the construction of new sections of the diažnice and expressways.3. The place of implementation of the project is in Preov region, Preov district. The D1 diažnica is a part of the TEN-T Core network, with an important national as well as international transport function.4. Measurement indicators of the project sú:Celková of newly built roads on the TEN-T network (CORE) 7870 m.Saving time in road transport at distances and express roads EUR 34 515 715.Saving of NO2 emissions (impact of construction of diažnicas) 10 tonnes.Saving emissions of PM10 (impact of construction of diažnics) 2.4 tons.5. Basic data on stavbe:Dĺka communication:                          7 870 mCategory of communication:                   D 26,5/100Design speed:                           100 km/hourTunnel column:                                      2 244 mTunnel category:                              2 x T 7.5Number of cartoons:                             2 out-of-the-level screams Preov West, non-level screams Preov SouthNumber of bridge objects:              18Total number of branches of kriovatka:    17The time of the construction is the management and maintenance centre of SSÚD Preov (English)
    15 September 2021
    0 references

    Identifiers

    311021Q625
    0 references