Reducing the energy intensity of the public building NPPC – Lu ianky building (Q3102359)

From EU Knowledge Graph
Revision as of 13:33, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3102359 in Slovakia
Language Label Description Also known as
English
Reducing the energy intensity of the public building NPPC – Lu ianky building
Project Q3102359 in Slovakia

    Statements

    0 references
    1,078,765.13 Euro
    0 references
    1,269,135.45 Euro
    0 references
    0.85 percent
    0 references
    1 June 2017
    0 references
    1 December 2020
    0 references
    Národné požnohospodárske a potravinárske centrum
    0 references

    48°20'50.50"N, 18°1'38.42"E
    0 references
    Ciežom projektu je na základe analýzy nákladov na energie zníženie spotreby energie pri prevádzke administratívnej budovy NPPC - objekt Lužianky. Súčasou projektu je realizácia nasledujúcich efektívnych opatrení a odporúčaní s ciežom racionalizácie spotreby energie, ktoré vedú k maximalizácii úspor energie a zníženiu energetickej náročnosti objektu:Zateplenie obvodových stien a zateplenie strešného pl᚝aVýmena otvorových konštrukciíInštalácia termoregulačných ventilov na vykurovacích telesách a hydraulické vyváženie vykurovacej sústavy objektuVýmena svetelných zdrojov a svietidielInštalácia termoohrevu TÚVRealizáciou navrhovaných úprav podža energetického auditu a projektovej dokumentácie sa popri energetických úsporách podstatne prispeje k zlepšeniu tepelnej pohody a celkovej mikroklímy v interiéri. (Slovak)
    0 references
    On the basis of an analysis of energy costs, the aim of the project is to reduce energy consumption during the operation of the administrative building NPPC – Luianka building. The current project is the implementation of the following effective measures and recommendations with the aim of rationalising energy consumption, which lead to maximising energy savings and reducing the energy intensity of objektu:Zateplenie perimeter walls and insulation of the heated surfaceReplacement of the hole contrusionInstallation of thermoregulating valves on heating elements and hydraulic weighing of the heating system of the buildingReplacement of light sources and luminairesThe installation of thermal heater TÚVRealisation of proposed modifications under the energy audit and project documentation will contribute significantly to the improvement of thermal comfort and the overall microclimate in the interior. (English)
    15 September 2021
    0 references

    Identifiers

    310041F911
    0 references