No label defined (Q3100868)

From EU Knowledge Graph
Revision as of 13:09, 15 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to expand the capacity of the Materská Koly Karpatská 3, Banská Bystrica by 1 class with the number of 22 children in the existing object of the Maternity School and to improve the existing capacities of the Maternity School for 107 children (data as of 15.9.2016), which will be achieved through activities projektu:Rozírenie capacity and improvement of existing capacities of the Materská Koly Karpatská 3, Banská Bystric...)
Jump to navigation Jump to search
Project Q3100868 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3100868 in Slovakia

    Statements

    0 references
    352,663.95 Euro
    0 references
    414,898.76 Euro
    0 references
    0.85 percent
    0 references
    1 March 2018
    0 references
    1 November 2020
    0 references
    Mesto Banská Bystrica
    0 references

    48°43'27.16"N, 19°7'44.08"E
    0 references
    Ciežom projektu je rozšírenie kapacity  Materskej školy Karpatská 3, Banská Bystrica o 1 triedu s počtom 22 detí v existujúcom objekte materskej školy a  zlepšenie existujúcich kapacít materskej školy pre 107 detí (údaj k 15.9.2016), čo bude dosiahnuté prostredníctvom aktivít projektu:Rozšírenie kapacity a zlepšenie existujúcich kapacít Materskej školy Karpatská 3, Banská Bystrica v nadväznosti na typ aktivity b rozširovanie kapacít existujúcich objektov materských škôl prístavbou, nadstavbou, rekonštrukciou, zmenou dispozície objektov;Materiálno-technické vybavenie materskej školy – nábytok, v nadväznosti na typ aktivity e obstaranie materiálno-technického vybavenia materských škôl;  Zvyšovanie energetickej hospodárnosti objektu C budovy Materskej školy Karpatská 3, Banská Bystrica v nadväznosti na typ aktivity f zvyšovanie energetickej hospodárnosti budov materských škôl.Ciež projektu je v súlade s globálnym ciežom  IROP, ktorým je prispie k zlepšeniu kvality života a zabezpeči udržatežné poskytovanie verejných služieb s dopadom na vyvážený a udržatežný územný rozvoj, hospodársku, územnú a sociálnu súdržnos regiónov, miest a obcí.Ciež projektu je plne v súlade so špecifickým ciežom  príslušnej Prioritnej osi č. 2: źahší prístup k efektívnym a kvalitnejším verejným službám, ktorým je Zvýšenie hrubej zaškolenosti detí materských škôl  a v súlade s tematickým ciežom č. 10 – Investovanie do vzdelania, zručností a celoživotného vzdelávania.Ciež projektu je plne v súlade s Investičnou prioritou č. 2.2: Investovanie do vzdelania, školení a odbornej prípravy, zručností a celoživotného vzdelávania prostredníctvom vývoja vzdelávacej a výcvikovej infraštruktúry.Projekt prispieva k sociálnemu aspektu zosúladenia súkromného a pracovného života rodičov detí navštevujúcich nové/rozšírené zariadenie. Ciežovou skupinou sú deti predškolského veku (3-5 ročné) a ich zákonní zástupcovia, ktorí tak budú ma možnos nastúpi do zamestnania. (Slovak)
    0 references
    The aim of the project is to expand the capacity of the Materská Koly Karpatská 3, Banská Bystrica by 1 class with the number of 22 children in the existing object of the Maternity School and to improve the existing capacities of the Maternity School for 107 children (data as of 15.9.2016), which will be achieved through activities projektu:Rozírenie capacity and improvement of existing capacities of the Materská Koly Karpatská 3, Banská Bystrica following the type of activity b expansion of the capacities of existing buildings of the mother wheel by extension, superstructure, reconstruction, change of the layout of objects; material and technical equipment of the mother wheel furniture, in connection with the type of activity e acquisition of material and technical equipment of the mother wheel;  Increasing the energy performance of building C of the Materská koly Karpatská 3 building, Banská Bystrica, following the type of activity f increasing the energy performance of the buildings of the mother wheel.Also, the project is in line with the global objective of IROP, which is to contribute to improving the quality of life and to ensure the aggravating provision of public services with an impact on well-balanced and breathable territorial development, economic, territorial and social justice of regions, towns and villages. The project also fully complies with the specific objective of the relevant Priority Axis No. 2: easy access to effective and high-quality public commitments, which is to increase the gross education of children of motherhoods and in accordance with thematic objective 10 Investment in education, skills and life-long education.Also the project is fully in line with Investment Priority No 2.2: Investing in education, training and training, skills and life-long learning through the development of education and training infrastructure.The project contributes to the social aspect of reconciling private and work life of parents of children visiting new/spread facilities. The target group is children of preschool age (3-5 years old) and their legal representatives, who will thus take me into employment. (English)
    15 September 2021
    0 references

    Identifiers

    302021G733
    0 references