No label defined (Q3100834)

From EU Knowledge Graph
Revision as of 13:09, 15 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The subject of this project is the construction of cycling infrastructure, additional cycling infrastructure and promotion of cycling traffic in Pieany. The implementation of the proposed objective will lead to an increase in infrastructure capacity for non-motorised transport in the city, which will contribute to an increase in the share of people using this mode of transport. The city has also built several cycling roads, the vision for the fu...)
Jump to navigation Jump to search
Project Q3100834 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3100834 in Slovakia

    Statements

    0 references
    400,094.09 Euro
    0 references
    470,698.93 Euro
    0 references
    0.85 percent
    0 references
    1 September 2018
    0 references
    1 April 2021
    0 references
    Mesto Piešany
    0 references

    48°35'21.23"N, 17°50'2.58"E
    0 references
    Predmetom predkladaného projektu je vybudovanie cyklistickej infraštruktúry, doplnkovej cyklistickej infraštruktúry a propagácia cyklistickej dopravy v meste Piešany. Vďaka zrealizovaniu predkladaného zámeru dôjde k zvýšeniu kapacity infraštruktúry pre nemotorovú dopravu v meste, čo prispeje k zvýšeniu podielu osôb využívajúcich tento druh dopravy. Mesto aj doposiaž vybudovalo niekožko cyklistických komunikácií, víziou do budúcnosti je sieovanie týchto trás a zvýšenie dostupnosti bodov záujmu (najmä občianskej infraštruktúry a miest dochádzky za prácou), avšak na dobudovanie ďalších trás mestu chýba dostatok finančných prostriedkov, preto sa obracia na riadiaci orgán pre IROP so žiadosou o dotáciu. Ciežom projektu je zvýšenie kapacity nemotorovej dopravy, zvýšenie počtu prepravovaných osôb prostredníctvom cyklistickej dopravy a propagácia cyklistickej dopravy. Jedným z podnetov pre predloženie predmetného projektu bol práve rastúci počet obyvatežov mesta využívajúcich cyklistickú dopravu. Vďaka realizácii projektu bude mesto schopné uspokoji potreby občanov spojené s využívaním nemotorovej dopravy. Vytýčený ciež projektu bude dosiahnutý zrealizovaním dvoch hlavných aktivít projektu  „Výstavba infraštruktúry pre nemotorovú dopravu vrátane doplnkovej infraštruktúry“ a  „Propagácia cyklistickej dopravy v meste prostredníctvom mobilnej aplikácie“ s celkovou dĺžkou trvania 13 mesiacov. V rámci týchto aktivít budú uskutočnené stavebné práce a nákup ďalšieho vybavenia. Výsledkom zrealizovaného projektu bude dosiahnutie meratežných ukazovatežov projektu: dĺžka nových úsekov cyklistických komunikácií – 2,3 km, počet vytvorených prvkov doplnkovej cyklistickej infraštruktúry – 1 prvok a počet zavedených propagačných aktivít – 2 propagačné aktivity. Miestom realizácie projektu je mesto Piešany. (Slovak)
    0 references
    The subject of this project is the construction of cycling infrastructure, additional cycling infrastructure and promotion of cycling traffic in Pieany. The implementation of the proposed objective will lead to an increase in infrastructure capacity for non-motorised transport in the city, which will contribute to an increase in the share of people using this mode of transport. The city has also built several cycling roads, the vision for the future is to sieve these routes and increase the availability of points of interest (particularly civic infrastructure and commuting places), and for the completion of other routes the city lacks sufficient financial resources, so it turns to the managing body for IROP with iados for a subsidy. The aim of the project is to increase the capacity of non-motorised transport, increase the number of passengers transported through cycling and promote cycling. One of the incentives for the project in question was the growing number of inhabitants of the city using cycling traffic. Thanks to the implementation of the project, the city will be able to meet the needs of citizens associated with the use of non-motorised transport. The objective of the project will be achieved through the realisation of two main activities of the project Construction of infrastructure for non-motor transport, including additional infrastructure and the promotion of cycling traffic in the city through a mobile application with a total duration of 13 months. As part of these activities, construction works and the purchase of additional equipment will be carried out. The result of the realised project will be the achievement of the measurement indicators of the project: the number of new sections of cycling roads 2.3 km, the number of additional bicycle infrastructure elements created 1 element and the number of promotional activities introduced 2 promotional activities. The place of implementation of the project is the city of Pieany. (English)