No label defined (Q3100825)

From EU Knowledge Graph
Revision as of 13:09, 15 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The city of Nitra plans to build a cycle path with subsequent connectivity. Section of the route Chrenová II. stage Tr. Andrea Hlinka Long about the 2163.5 m is connected section Chrenová I stage and cycle path Nitra Vráble. The planned cycle lane will be symmetrical with pedestrian path. There will be a trail on Long Street and a crossing for pedestrians and cyclists on Andrea Hlinka Street, which will follow the route on Long Street. Cycle lap...)
Jump to navigation Jump to search
Project Q3100825 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3100825 in Slovakia

    Statements

    0 references
    264,404.66 Euro
    0 references
    311,064.3 Euro
    0 references
    0.85 percent
    0 references
    1 July 2015
    0 references
    1 March 2019
    0 references
    Mesto Nitra
    0 references

    47°52'23.52"N, 18°10'58.76"E
    0 references
    Mesto Nitra má v pláne vybudova sie cyklotrás s následnou prepojitežnosou. Úsek trasy Chrenová II. etapa Tr. Andrea Hlinku – Dlhá o dĺžke 2163,5 m má prepája úsek Chrenová I. etapa a cyklotrasu Nitra – Vráble. Plánovaný cyklopruh bude súmerne s chodníkom pre chodcov. Vybudovaný bude chodník na Dlhej ulici a prechod pre chodcov a cyklistov na ulici Andrea Hlinku ktorý bude nadväzova na trasu na Dlhej ulici. Cyklopruhy oddelené od komunikácie pre motorové vozidlá budú bezpečné pre účastníkov. Projekt zabezpečí prepojenie cyklotrás a umožní cestovanie za zamestnaním, športom, alebo rekreáciou za pomoci využitia nemotorovej formy dopravy. Vďaka týmto opatreniam bude možnos využitia cyklistickej dopravy ako plnohodnotný spôsob prepravy v rámci mobility v mestách a mestských oblastiach a vytvori žahko dostupnú a cenovo výhodnú alternatívu k mestskej autobusovej doprave. (Slovak)
    0 references
    The city of Nitra plans to build a cycle path with subsequent connectivity. Section of the route Chrenová II. stage Tr. Andrea Hlinka Long about the 2163.5 m is connected section Chrenová I stage and cycle path Nitra Vráble. The planned cycle lane will be symmetrical with pedestrian path. There will be a trail on Long Street and a crossing for pedestrians and cyclists on Andrea Hlinka Street, which will follow the route on Long Street. Cycle laps separated from road for motor vehicles will be safe for participants. The project will ensure the interconnection of cycle paths and monetise travel for work, port or recreation with the help of a non-motorised form of transport. Thanks to these measures, cycling monos will be a fully-fledged mode of transport for urban and urban mobility and will create an easily accessible and cost-effective alternative to urban bus transport. (English)
    15 September 2021
    0 references

    Identifiers

    302011F984
    0 references