Extension and endowment of outpatient medical equipment from the structure of the “Anghel Saligny” Municipal Hospital – Fetesti (Q2743332)

From EU Knowledge Graph
Revision as of 12:47, 15 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q2743332 in Romania
Language Label Description Also known as
English
Extension and endowment of outpatient medical equipment from the structure of the “Anghel Saligny” Municipal Hospital – Fetesti
Project Q2743332 in Romania

    Statements

    0 references
    7,484,780.56 Romanian Leu
    0 references
    1,496,956.112 Euro
    13 September 2021
    0 references
    10,692,543.64 Romanian Leu
    0 references
    2,138,508.728 Euro
    13 September 2021
    0 references
    0.7 percent
    0 references
    1 March 2019
    0 references
    31 December 2021
    0 references
    UAT MUNICIPIUL FETESTI
    0 references

    44°24'46.58"N, 26°11'1.21"E
    0 references
    Extinderea și dotarea ambulatoriului integrat al Spitalului Județean “Anghel Saligny” – Fetești prin construirea unui corp-anexă al ambulatoriului existent și dotarea acestuia cu mobilier și echipamente. (Romanian)
    0 references
    Expanding and equipping the integrated outpatients of the “Anghel Saligny” County Hospital – Fetești by building an annex body of the existing outpatients and equipping it with furniture and equipment. (English)
    14 September 2021
    0 references
    Municipiul Feteşti, Romania
    0 references

    Identifiers

    123672
    0 references