No label defined (Q3095738)

From EU Knowledge Graph
Revision as of 09:49, 14 September 2021 by DG Regio (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project 0.7166529825749364 in Romania
Language Label Description Also known as
English
No label defined
Project 0.7166529825749364 in Romania

    Statements

    0 references
    1,281,442,332.0 Romanian Leu
    0 references
    256,288,466.4 Euro
    13 September 2021
    0 references
    1,507,579,214.0 Romanian Leu
    0 references
    301,515,842.8 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 January 2014
    0 references
    30 December 2023
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references
    The overall objective of this project is to achieve a fast and safe connection between the municipalities of Târgu Mures and Cluj by ensuring the continuity of 2B Câmpia Turzii - Cluj Napoca Vest (Gilau) motorway section with the sections 2A and 1C, and to relief the traffic congestion from the localities along the motorway. The main objectives of the project (construction of 51,796 km of 2x2 new motorway together with 4,7 km of 2x2 link road to Targu Mures, long - lasting development of transport sector, improving the traffic safety, reducing the environmental impact, reducing the number of accidents on the national road DN15, reducing the transit traffic, reducing the travel time) are in terms with LIOP 2014 - 2020, Priority Axis no. 1 - “Improving mobility by developing the TEN-T and subway network”, Thematic objective 7, Specific Objective 1.1 - "Increasing mobility on the central TEN-T road network”. (Romanian)
    0 references
    Municipiul Târgu Mureş, Romania
    0 references
    Municipiul Câmpia Turzii, Romania
    0 references

    Identifiers

    115748
    0 references