UPGRADING OF BUS STOPS IN THE THORN MUNICIPALITY (Q2895514)

From EU Knowledge Graph
Revision as of 13:38, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2895514 in Portugal
Language Label Description Also known as
English
UPGRADING OF BUS STOPS IN THE THORN MUNICIPALITY
Project Q2895514 in Portugal

    Statements

    0 references
    450,035.08 Euro
    0 references
    1 October 2019
    0 references
    31 December 2020
    0 references
    MUNICIPIO DE ESPINHO
    0 references
    0 references

    41°0'30.10"N, 8°38'21.88"W
    0 references
    Trata-se de um pojecto que visa contribuir para a construção de uma Rede de Interfaces (micro-modais) mais funcional, integrada no território, cómoda e segura, que assegurem a ligação dos autocarros urbanos, no interior e exterior do concelho, com especial relevância para as ligações aos concelhos limítrofes. Para tal compreende a beneficiação/criação de 109 abrigos e 20 Totens ao longo do concelho. (Portuguese)
    0 references
    This is a project aimed at contributing to the construction of a more functional (micromodal) Interface Network, integrated in the territory, comfortable and safe, to ensure the connection of urban buses, inside and outside the municipality, with particular relevance to the links to the neighbouring municipalities. This includes the upgrading/creation of 109 shelters and 20 Totens throughout the county. (English)
    8 July 2021
    0 references
    Espinho
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000221
    0 references