Improvement of Energy Efficiency of the Basic School of the 2nd and 3rd Cycle, José Cardoso Pires (Q2880609)

From EU Knowledge Graph
Revision as of 11:45, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2880609 in Portugal
Language Label Description Also known as
English
Improvement of Energy Efficiency of the Basic School of the 2nd and 3rd Cycle, José Cardoso Pires
Project Q2880609 in Portugal

    Statements

    0 references
    182,565.39 Euro
    0 references
    3 September 2018
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DA AMADORA
    0 references
    Q2994223 (Deleted Item)
    0 references

    38°46'37.81"N, 9°14'14.57"W
    0 references
    Implementação de medidas de melhoria de desempenho energético na EB 2, 3 José Cardoso Pires: substituição da iluminação fluorescente tubular T8, por soluções LED mais eficientes instalação de sistemas solares térmicos e de sistema solar fotovoltaico remoção da cobertura de amianto e substituição por painel sandwich instalação de sistema de monitorização do consumo de energia substituição de vãos envidraçados por soluções mais eficientes. (Portuguese)
    0 references
    Implementation of energy performance improvement measures in EB 2, 3 José Cardoso Pires: Replacement of T8 tubular fluorescent lighting with more efficient LED solutions installation of solar thermal systems and photovoltaic solar system removal of asbestos cover and replacement by sandwich panel installation of energy consumption monitoring system replacement of spans with more efficient solutions. (English)
    7 July 2021
    0 references
    Amadora, Mina de Água
    0 references

    Identifiers

    LISBOA-03-1203-FEDER-000033
    0 references