Structuring of the Urban Corridor Av. of the Entrepreneur – Business Location Area, for public transport and bicycles (Q2878152)

From EU Knowledge Graph
Revision as of 11:37, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2878152 in Portugal
Language Label Description Also known as
English
Structuring of the Urban Corridor Av. of the Entrepreneur – Business Location Area, for public transport and bicycles
Project Q2878152 in Portugal

    Statements

    0 references
    800,347.09 Euro
    0 references
    10 February 2017
    0 references
    31 October 2019
    0 references
    MUNICIPIO DE CASTELO BRANCO
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação pretende-se proceder à construção do corredor urbano de elevada procura, entre a Av. do Empresário e a Rua A da Área de Localização Empresarial, de modo a criar condições para a redução da emissão de gases com efeitos de estufa, devido à redução das distâncias e dos tempos de percurso, contribuindo para a melhoria da rede de interface articulando rodovias e ciclovias. (Portuguese)
    0 references
    With this operation it is intended to proceed to the construction of the urban corridor of high demand, between Av. do Empresário and Rua A of the Area of Business Location, in order to create conditions for reducing the emission of greenhouse gases, due to the reduction of distances and journey times, contributing to the improvement of the interface network linking motorways and bike paths. (English)
    7 July 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000025
    0 references