Arrival and Confluence Stops (Q2878141)

From EU Knowledge Graph
Revision as of 11:37, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2878141 in Portugal
Language Label Description Also known as
English
Arrival and Confluence Stops
Project Q2878141 in Portugal

    Statements

    0 references
    305,609.83 Euro
    0 references
    25 May 2017
    0 references
    8 November 2019
    0 references
    MUNICIPIO DE TORRES VEDRAS
    0 references
    0 references
    A operação visa a construção de 12 Paragens de Chegada e Confluência em locais estratégicos da cidade de Torres Vedras. Estas interfaces desempenham um papel determinante no funcionamento de um sistema de transportes intermodal e alinham com as estratégias nacionais e europeias de redução dos GEE através da aposta na mobilidade urbana sustentável. (Portuguese)
    0 references
    The operation aims at the construction of 12 Arrival and Confluence stops at strategic locations in the city of Torres Vedras. These interfaces play a key role in the operation of an intermodal transport system and align with national and European GHG reduction strategies through the focus on sustainable urban mobility. (English)
    7 July 2021
    0 references
    Torres Vedras, União das freguesias de Torres Vedras (São Pedro, Santiago, Santa Maria do Castelo e São Miguel) e Matacães
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000013
    0 references