Requalification of Rua Carlos marnoto (Q2878255)

From EU Knowledge Graph
Revision as of 11:35, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2878255 in Portugal
Language Label Description Also known as
English
Requalification of Rua Carlos marnoto
Project Q2878255 in Portugal

    Statements

    0 references
    112,877.22 Euro
    0 references
    7 January 2019
    0 references
    28 March 2020
    0 references
    MUNICÍPIO DE ÍLHAVO
    0 references
    Q2991046 (Deleted Item)
    0 references

    40°35'48.01"N, 8°40'54.98"W
    0 references
    A presente operação consiste essencialmente numa redefinição do perfil da via (alinhamentos de vias e bermas / recolha de águas para meias-canas / redução dos ressaltos de piso) e numa uniformização dos materiais de revestimento bem como uma ligeira obra de correção de componentes das redes de águas e saneamento. (Portuguese)
    0 references
    This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English)
    7 July 2021
    0 references
    Ílhavo, Ílhavo (São Salvador)
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000084
    0 references