More efficient public lighting: Urbanisation Quinta da Cerca e Urbanização Rota do Sol (Q2857600)

From EU Knowledge Graph
Revision as of 09:11, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2857600 in Portugal
Language Label Description Also known as
English
More efficient public lighting: Urbanisation Quinta da Cerca e Urbanização Rota do Sol
Project Q2857600 in Portugal

    Statements

    0 references
    0 references
    50,303.36 Euro
    0 references
    1 January 2019
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE CASTRO MARIM
    0 references
    0 references

    37°13'4.58"N, 7°26'44.56"W
    0 references
    A operação visa a implementação de medidas de eficiência energética em equipamentos de Iluminação Pública, propondo a instalação de luminárias mais eficientes, do tipo LED,nos sistemas de iluminação pública da Urbanização Quinta da Cerca e da Urbanização Rota do Sol em Castro Marim. A intervenção proposta permitirá a utilização de equipamentos de Iluminação Pública mais eficientes, reduzindo de forma significativa os consumos de energia elétrica. (Portuguese)
    0 references
    The operation aims to implement energy efficiency measures in public lighting equipment, proposing the installation of more efficient lamps, of the LED type, in the public lighting systems of Urbanização Quinta da Cerca and Urbanização Rota do Sol in Castro Marim. The proposed intervention will allow the use of more efficient public lighting equipment, significantly reducing electricity consumption. (English)
    6 July 2021
    0 references
    Castro Marim
    0 references

    Identifiers

    ALG-03-1203-FEDER-000026
    0 references