Renewable Energy Storage Cells – São Miguel Island (Q2853703)

From EU Knowledge Graph
Revision as of 09:00, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 79.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2853703 in Portugal
Language Label Description Also known as
English
Renewable Energy Storage Cells – São Miguel Island
Project Q2853703 in Portugal

    Statements

    0 references
    0 references
    20,000,000.0 Euro
    0 references
    16 July 2018
    0 references
    30 September 2022
    0 references
    EDA - ELECTRICIDADE DOS AÇORES, S.A.
    0 references
    0 references

    37°49'21.07"N, 25°31'10.16"W
    0 references
    A operação consiste na instalação de Sistema de Armazenamento de Energia, tendo-se escolhido a localização junto à subestação do Caldeirão, onde a EDA possui terreno próprio, por outro lado, trata-se da melhor localização tendo em conta a sua proximidade aos principais centros de consumo.Por outro lado, existe a vantagem de redução de perdas, com a possibilidade de injeção/consumo de potência reativa, disponibilizada pelo Sistema de Armazenamen (Portuguese)
    0 references
    The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage (English)
    6 July 2021
    0 references
    Ribeira Grande
    0 references

    Identifiers

    ACORES-04-1001-FEDER-000002
    0 references